background image

2

EUTECTIC EC-10 DV

Maximum operating pressure 60 psi.
All boilers hydrostatically tested — A.S.M.E.
* For forced hot water heating systems where the boiler and all piping are

located within the area to be heated, the boiler may be selected on the basis
of D.O.E. capacity output. The net AHRI output ratings shown are based on
an allowance for piping and pickup of 1.15 (water).  D.O.E. capacity output is
divided by the allowance to obtain net rating. The Slant/Fin Technical Service
department should be consulted before selecting a boiler for unusual piping
and pickup requirements such as intermittent system operation, extensive
piping, etc.

† Ratings apply to the use of light oil at 140,000 Btu per gallon  and apply only

when burner models listed on pages 8 of this manual are used, and are
properly adjusted to produce 13% CO2.

# All dimensions subject to normal manufacturing tolerance.
NOTE:  All boilers under 300,000 Btuh (87.9 kw) input are tested and rated for
capacity under the U.S. Department of Energy (D.O.E.) Test Procedures for
Boilers.

TABLE 1:  Ratings and Dimensions

EC-13DV

0.65

91,000

79

69

87

36

22-1/4

27

5

11-13/16

2

EC-14DV

0.80 112,000

98

85

87

41

27-1/4

32

5

16-13/16

2

EC-15DV

1.00 140,000

123

107  

87

46

32-1/4

37

5

21-13/16

2

EC-16DV

1.15 161,000

141

123

87

51

37-1/4

42

6

26-13/16

4

BOILER

MODEL

NO.

GPH

BTUH

AHRI

BURNER

CAPACITY

OIL INPUT †

D.O.E.

HEATING

CAPACITY

MBH *

WATER

APPROX.

OVERALL

LENGTH

“A”

AHRI

WATER

NET

RATING

MBH *

DIMENSIONS (inches) #

AFUE %

BOILER

LENGTH

“B”

BOILER

LENGTH

“C”

FLUE

DIA.

“D”

DISTANCE
BETWEEN

LEGS

“E”

FLUE

OUTLET

LENGTH

“F”

Figure 1: Dimensions (inches)

1-1/4 threaded

supply

Flue outlet øD

1-1/4 threaded
return pipe

Drain outlet

Relief valve 3/4’’

Supply Pipe Mounted

Tridicator

Panel Mounted
Tridicator Pressure
Sensor Well

Panel Mounted
Tridicator Temperature
Sensor Well

A

Содержание EUTECTIC EC-10DV Series

Страница 1: ...ditional requirements in this Slant Fin Instruction Manual Where there is any differ ence the more stringent requirement shall govern In addition where required by the authority having jurisdiction th...

Страница 2: ...usted to produce 13 CO2 All dimensions subject to normal manufacturing tolerance NOTE All boilers under 300 000 Btuh 87 9 kw input are tested and rated for capacity under the U S Department of Energy...

Страница 3: ...anticipated snow line The terminal shall be positioned so that flue gases are not directed where they can jeopardize people overheat combustible structures or enter buildings Vent terminal should be...

Страница 4: ...system causes the introduction of a frequent supply of fresh water into the boiler This will cause damage to the boiler Use of heat exchangers will prevent this damage PIPING FOR WATER UNITS NOTE On...

Страница 5: ...ld be located on the boiler supply pipe and the expansion tank and air scoop should be located near the pump suction INSTALLING THE BURNER See Burner Data pages 12 13 and Burner Manual supplied with b...

Страница 6: ...nt terminal and air supply pipe are properly installed and clear of obstruction Note Neither overfire nor flue draft should exceed 0 35 WC during burner operation THE FLUE IS UNDER POSITIVE PRESSURE D...

Страница 7: ...EUTECTIC EC 10 DV 7 Aquastat Control and Honeywell R7184P Primary Single Zone Wiring for Beckett Carlin Burners Only...

Страница 8: ...8 EUTECTIC EC 10 DV...

Страница 9: ...EUTECTIC EC 10 DV 9...

Страница 10: ...EUTECTIC EC 10 DV 10 Honeywell L7248L Beckett 7600A and HydroLevel 3250 Controls See Adjusting Settings error codes for L7248L on page 11...

Страница 11: ...rting to default settings or has stopped running the Outdoor Reset algorithms The warnings are cleared when the issue s is resolved b To clear Err 8 condition depress and hold all three user keys simu...

Страница 12: ...lectrode Setting Turbulator location Picture 1 TURBULATOR SETTING 1 Loosen nut 1 then turn the screw 2 until the index marker 3 is aligned with the correct index number 2 Retighten the retaining nut 1...

Страница 13: ...r to increase combustion air turn the screw clockwise indicator to decrease combustion air 3 The final position of the air damper will vary on each installation Use instruments to establish the proper...

Страница 14: ...roper burner operation ONLY THE NOZZLES SPECIFIED IN THIS MANUAL OR ON THE BURNER LABEL SHOULD BE USED FOR REPLACEMENT A flue brush triangular shape is supplied with boiler 7 Protect all of the firesi...

Страница 15: ...___________________________ Model _____________________________ Serial _____________________________ SLANT FIN CORPORATION Greenvale N Y 11548 Phone 516 484 2600 FAX 516 484 5921 Canada Slant Fin LTD...

Отзывы: