CHS Series                                                           CHS 300-399 Common Venting 

Slant Fin Corp.

 

 

 

 

 

 

12 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Air-Inlet IN 

 

4. 

Branch

  –  Insert  the  6”  x  4”  Branch  fittings  into  the  4” 

Elbows installed in Step 3, starting with the boiler on the left 
(start with the boiler on the right if the Combustion Air-inlet 
is  being  piped  to  the  left).  Use  Centrocerin  lubricant  and  a 
Connector Ring at each connection.   

 

NOTE:

  Combustion  Air-Inlet  Branches  are  piped  to  the  right; 

therefore Branches are required to be cut to an overall length of 33” 

 

Branch 

4” Connector 
Ring

 

 

 

5. 

Cap

  –  Install  the  Cap  onto  the  left  side  (male 

end) of the Air-Inlet Manifold (if Combustion Air-
inlet  is  being  piped  to  the  left,  install  Cap  on  the 
right  side  of  the  Manifold).  Use  Centrocerin 
lubricant and a Connector Ring at each connection. 

 

Cap 

6” Branch  

6” Connector 
Ring 

Содержание 818 192

Страница 1: ...on which if not avoided will result in serious injury or death Warning Sign Indicates a hazardous situation which if not avoided could result in serious injury or death Caution Sign plus Safety Alert...

Страница 2: ...other than models CHS 300 399 see Table 2 1 to identify which boilers can be used with each CHS Common Venting Only install boiler models CHS 300 399 with this Common Venting system Failure to follow...

Страница 3: ...Air Inlet piping being directed to the LEFT 818 193 Common Venting for the Exhaust Vent Outlet and Combustion Air Inlet of three 3 Slant Fin CHS 300 399 boilers Models CHS 300 399 Common Venting Show...

Страница 4: ...192 818 190 3 x CHS 818 193 818 191 Exhaust Support 5 2 x CHS 818 192 818 190 3 x CHS 818 193 818 191 Notes 1 The long Exhaust Appliance Adapters are only supplied with CHS 818 193 3 boiler CHS 300 39...

Страница 5: ...ating the Common Vent System End Pipe PPs UV 818 201 6 x 20 818 202 6 x 39 Elbow PPs UV 6 818 203 87 Elbow Elbow PPs UV 6 818 204 45 Elbow Straight Vent Length PPs UV 818 207 6 x 26 5 Notes 1 With the...

Страница 6: ...Common Venting Supporting Venting Connector Rings mandatory on every exhaust vent and air inlet connection Connector Rings lock the venting together and prevent it from pulling apart Consult Centrothe...

Страница 7: ...ient amount of wall space to work with both vertically and horizontally Three boiler systems require a minimum of 100 x 100 of wall space two boiler systems require a minimum of 100 vertically by 70 h...

Страница 8: ...al Floor Stands and connect together using the Twinning Kit s Once assembled ensure the bolts are fastened securely Level the assembled stand vertically and horizontally using the adjustable leveling...

Страница 9: ...n Figure 4 1 18 and 40 for the right side Combustion Air Inlet and Exhaust Gas outlet respectively 33 for the others NOTE This only applies to P N 818 192 and P N 818 193 being piped to the LEFT Figur...

Страница 10: ...d to achieve the required slope see Step 8 of this section Failure to assemble the CHS 300 399 Common Venting in the correct order may result in property damage personal injury or death Connector Ring...

Страница 11: ...nsure the assembled height of the Air Inlet Supports measure 10 from the top of the boiler as shown adjust as necessary 2 Assembled height 10 Air Inlet Support Air Inlet Appliance Adapter 3 Air Inlet...

Страница 12: ...ntrocerin lubricant and a Connector Ring at each connection NOTE Combustion Air Inlet Branches are piped to the right therefore Branches are required to be cut to an overall length of 33 Branch 4 Conn...

Страница 13: ...sides if the Exhaust Gas is being piped to the left Install a Non Return Valve into each appliance adapter Use Centrocerin lubricant and Connector Ring at each connection NOTE Exhaust Appliance Adapte...

Страница 14: ...t if the Exhaust Gas is being piped to the left Use Centrocerin lubricant and a Connector Ring at each connection NOTE Exhaust gas branches are piped to the right therefore Branches are required to be...

Страница 15: ...tails DO NOT install condensate lines outside A frozen or blocked drain will cause the condensate to back up and leak This may result in damage to boiler components resulting in a no heat condition pr...

Страница 16: ...ating the Common Vent System Terminations are to be DIRECT VENT ONLY Failure to follow these instructions may result in property damage serious injury or death Refer to the boiler Installation and Ope...

Страница 17: ...Termination Details Refer to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Min 12 above grade and snow level Flashing Bird Screen PPs...

Страница 18: ...t Fin Corp 18 Sidewall Termination Figure 5 3 Sidewall Termination Example Model CHS 300 399 Shown Air Inlet Maximum 100 equivalent of 6 pipe Support Clamps spaced every 40 for horizontal runs Exhaust...

Страница 19: ...to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Air Inlet IN Exhaust OUT Air Inlet Bird Screen PPs UV Exhaust Vertical Min 18 Min 12 a...

Страница 20: ...to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Air Inlet IN Exhaust OUT Air Inlet Bird Screen PPs UV Exhaust Min 12 above ground and...

Страница 21: ...taining the boilers and CHS 300 399 Common Venting Building owner is responsible for keeping the Exhaust Vent and Air Inlet termination free of snow ice or other potential blockages and for scheduling...

Страница 22: ...e all venting for evidence of leaks If a leak is found repair or replace the part 5 Look for condensate or debris in the Non Return Valves if found remove and clean them 6 Examine the support clamps f...

Страница 23: ...CHS Series CHS 300 399 Common Venting Slant Fin Corp 23 NOTES...

Страница 24: ...Slant Fin Corp 2014 814 PUBLICATION CHS 40 CV U S A Slant Fin Corporation 100 Forest Drive Greenvale NY 11548 516 484 2600 www slantfin com...