background image

CHS Series                                                           CHS 300-399 Common Venting 

Slant Fin Corp.

 

 

 

 

 

 

 

 

Floor Stand Mounting Method 

CHS’s Floor Stands and Twinning Kits are designed with precise height and spacing for assembling the Common 
Vent Manifold System.  One Twinning Kit is required to joint two Floor Stands together; two Twinning Kits are 
required to join three Floor Stands together.  

 

 

P/N 818 169 – CHS 300-399 Floor Stand

 

 

P/N 818 220 – Floor Stand Twinning Kit

 

 

1.

 

Follow the directions outlined in the CHS Floor Stand installation instructions to assemble the individual 
Floor  Stands,  and  connect  together  using  the  Twinning  Kit(s).  Once  assembled,  ensure  the  bolts  are 
fastened securely. Level the assembled stand vertically and horizontally using the adjustable leveling legs.  

 

Figure 3-3 CHS’s Floor Stands & Connector Kits 

 
 
 
 
 
 
 
 
 
 
 

 
 
 

2.

 

Secure  the  assembled  Floor  Stand  to  the  floor  using  the  provided  Floor  Anchor  Brackets  and  field 
supplied anchors, see installation instructions provided with the Floor Stand. 

3.

 

Install the boilers on the Floor Stands see Figure 3-4. 

  

Figure 3-4 Boilers Floor Stand Mounted 

(Model CHS 300-399 Shown) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4.

 

Secure bottom bracket to the boiler and center cross member of the stand, refer to the CHS Floor Stand 
installation instructions.  

 

 

Twinning Kit 

Floor Stand 

Flue Outlet 

Air-Inlet 

Содержание 818 192

Страница 1: ...on which if not avoided will result in serious injury or death Warning Sign Indicates a hazardous situation which if not avoided could result in serious injury or death Caution Sign plus Safety Alert...

Страница 2: ...other than models CHS 300 399 see Table 2 1 to identify which boilers can be used with each CHS Common Venting Only install boiler models CHS 300 399 with this Common Venting system Failure to follow...

Страница 3: ...Air Inlet piping being directed to the LEFT 818 193 Common Venting for the Exhaust Vent Outlet and Combustion Air Inlet of three 3 Slant Fin CHS 300 399 boilers Models CHS 300 399 Common Venting Show...

Страница 4: ...192 818 190 3 x CHS 818 193 818 191 Exhaust Support 5 2 x CHS 818 192 818 190 3 x CHS 818 193 818 191 Notes 1 The long Exhaust Appliance Adapters are only supplied with CHS 818 193 3 boiler CHS 300 39...

Страница 5: ...ating the Common Vent System End Pipe PPs UV 818 201 6 x 20 818 202 6 x 39 Elbow PPs UV 6 818 203 87 Elbow Elbow PPs UV 6 818 204 45 Elbow Straight Vent Length PPs UV 818 207 6 x 26 5 Notes 1 With the...

Страница 6: ...Common Venting Supporting Venting Connector Rings mandatory on every exhaust vent and air inlet connection Connector Rings lock the venting together and prevent it from pulling apart Consult Centrothe...

Страница 7: ...ient amount of wall space to work with both vertically and horizontally Three boiler systems require a minimum of 100 x 100 of wall space two boiler systems require a minimum of 100 vertically by 70 h...

Страница 8: ...al Floor Stands and connect together using the Twinning Kit s Once assembled ensure the bolts are fastened securely Level the assembled stand vertically and horizontally using the adjustable leveling...

Страница 9: ...n Figure 4 1 18 and 40 for the right side Combustion Air Inlet and Exhaust Gas outlet respectively 33 for the others NOTE This only applies to P N 818 192 and P N 818 193 being piped to the LEFT Figur...

Страница 10: ...d to achieve the required slope see Step 8 of this section Failure to assemble the CHS 300 399 Common Venting in the correct order may result in property damage personal injury or death Connector Ring...

Страница 11: ...nsure the assembled height of the Air Inlet Supports measure 10 from the top of the boiler as shown adjust as necessary 2 Assembled height 10 Air Inlet Support Air Inlet Appliance Adapter 3 Air Inlet...

Страница 12: ...ntrocerin lubricant and a Connector Ring at each connection NOTE Combustion Air Inlet Branches are piped to the right therefore Branches are required to be cut to an overall length of 33 Branch 4 Conn...

Страница 13: ...sides if the Exhaust Gas is being piped to the left Install a Non Return Valve into each appliance adapter Use Centrocerin lubricant and Connector Ring at each connection NOTE Exhaust Appliance Adapte...

Страница 14: ...t if the Exhaust Gas is being piped to the left Use Centrocerin lubricant and a Connector Ring at each connection NOTE Exhaust gas branches are piped to the right therefore Branches are required to be...

Страница 15: ...tails DO NOT install condensate lines outside A frozen or blocked drain will cause the condensate to back up and leak This may result in damage to boiler components resulting in a no heat condition pr...

Страница 16: ...ating the Common Vent System Terminations are to be DIRECT VENT ONLY Failure to follow these instructions may result in property damage serious injury or death Refer to the boiler Installation and Ope...

Страница 17: ...Termination Details Refer to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Min 12 above grade and snow level Flashing Bird Screen PPs...

Страница 18: ...t Fin Corp 18 Sidewall Termination Figure 5 3 Sidewall Termination Example Model CHS 300 399 Shown Air Inlet Maximum 100 equivalent of 6 pipe Support Clamps spaced every 40 for horizontal runs Exhaust...

Страница 19: ...to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Air Inlet IN Exhaust OUT Air Inlet Bird Screen PPs UV Exhaust Vertical Min 18 Min 12 a...

Страница 20: ...to Centrotherm InnoFlue documentation included with termination components for complete installation instructions Air Inlet IN Exhaust OUT Air Inlet Bird Screen PPs UV Exhaust Min 12 above ground and...

Страница 21: ...taining the boilers and CHS 300 399 Common Venting Building owner is responsible for keeping the Exhaust Vent and Air Inlet termination free of snow ice or other potential blockages and for scheduling...

Страница 22: ...e all venting for evidence of leaks If a leak is found repair or replace the part 5 Look for condensate or debris in the Non Return Valves if found remove and clean them 6 Examine the support clamps f...

Страница 23: ...CHS Series CHS 300 399 Common Venting Slant Fin Corp 23 NOTES...

Страница 24: ...Slant Fin Corp 2014 814 PUBLICATION CHS 40 CV U S A Slant Fin Corporation 100 Forest Drive Greenvale NY 11548 516 484 2600 www slantfin com...

Отзывы: