17
16
SPLIT
SPLIT
7
8
A = B
A
B
18
20
LED
Measure the diagonals to check if frame
is square. If one diagonal is longer then
push on the corners at that diagonal.
Tighten all set screws once the diagonals
are equal to within 1/8’’.
5
6
Make sure the points on the frame pieces line up. Then finger tighten 2 of the set screws
to lock in the corners.
Содержание ZERO EDGE PRO
Страница 1: ...INSTALLERS PLEASE BE SURE TO LEAVE THIS MANUAL WITH THE OWNER THANK YOU ZERO EDGE PRO Owner s Manual...
Страница 22: ...43 FLYING MOUNT 42 WALL MOUNT 3 2 1 2 100 lbs 45 3 kg 100 lbs 45 3 kg FLOWN INSTALLATION...
Страница 25: ...9715 B Burnet Road Suite 400 Austin TX 78758 Tel 512 832 6939 Fax 512 832 6136 www screeninnovations com NOTES...