ZERO EDGE PRO
19
18
ZERO EDGE PRO
LED LIGHTS ATTACHMENT
1
Connect the lighting harness
with the included screws to
the nuts in the frame piece
with the lights attached to it.
NOTE: Steps 1 and 2 will have already been completed if possible to be shipped that way.
If so skip to step 3.
Plug in the lights to the
controller plugs.
2
If IP controlled LED lights are ordered, Phillips Hue hub must be purchased
and set up separately, see page 50 for IP lighting Instructions.
3
Cut the light strips at the copper pad as indicated to
the correct length such that they just overlap at the
middle of the top frame piece. DO NOT cut the light
strips at any other location.
+12V
B
G
R
+12VB
G
R
CUT HERE
Press in the lights to the channel on the frame. Do not crease the lights at the corners.
Содержание ZERO EDGE PRO
Страница 1: ...INSTALLERS PLEASE BE SURE TO LEAVE THIS MANUAL WITH THE OWNER THANK YOU ZERO EDGE PRO Owner s Manual...
Страница 22: ...43 FLYING MOUNT 42 WALL MOUNT 3 2 1 2 100 lbs 45 3 kg 100 lbs 45 3 kg FLOWN INSTALLATION...
Страница 25: ...9715 B Burnet Road Suite 400 Austin TX 78758 Tel 512 832 6939 Fax 512 832 6136 www screeninnovations com NOTES...