21
16
10
9
Slide the Straight Tube(9) and Curved Tube(10)
into Foams (11) as shown.
Lay one Straight Tube(9) with Foam and one
Curved Tube(10) with Foam on the ground.
Insert the Straight Tube(9) into the Curved
Tube(10). Secure with a Self-tapping screw(16).
Repeat this step to attach the five remaining
Straight Tubes(9) and Curved Tubes(10) together
(not shown).
8.
9.
8
11
9
10
11
9
Holes
12
7
Strap ring
Strap
10
12
Hole
14
Hole
A
12
Hexagon hole
10.
Make sure the Hexagon hole side of the cap is
against the net, and the holes on both the strap
ring and the caps are aligned.
Hold the pole cap close to a Curved Tube(10), then
Insert the Curved Tube(10) into the Pole Cap(12).
Make sure the holes on the curved tube, pole cap
and strap ring are aligned. then
insert the M5x44mm
bolt(15)
until it touches the nut in the Hexagon hole
of the pole cap, securing them together.
Repeat this step to assemble the remaining parts in
the same way.
B
C
Follow below steps to attach Curved tube to cap
A.
Identify the hexagon hole on the Pole Cap(12) with
a nut buried inside.
B.
Insert the Pole Cap(12) into one strap ring on the top
edge of net.
C.
Note: Make sure pole with two holes at the end
is on top.