
5
3.3 Safety System
This appliance features a safety system to guarantee
the safety of the operator. The operation of the equipment
must follow the item 03. Other procedures are unsafe and
must not be used.
3.4 Cleaning and Sanitizing
3.2.1 Approximate preparation time
ITEMS
Approximate time
Quantity [min - max.]
Tomato sauce
25 - 100 seconds
300 - 3000 g
Mayonnaise
até 13 seconds
350 - 3000 g
Mashed Potatoes
15 - 60 seconds
500 - 3000 g
Bread Flour
50 - 70 seconds
100 - 500 g
** Peanut Butter
up to 4 minutes
600 - 2000 g
MEATS
Meat
10 - 20 seconds
400 - 2500 g
Meat for Salad
10 - 20 seconds
400 - 2500 g
Meatballs
10 - 20 seconds
400 - 2500 g
Kibbeh
10 - 20 seconds
400 - 2500 g
SOUP CONDIMENTS
Onion
10 - 20 seconds
500 - 3000 g
Garlic
20 - 30 seconds
150 - 3200 g
Parsley
5 - 20 seconds
150 - 500 g
FRUITS AND JAMS
Fruit Salad
15-30 seconds
300 - 2500 g
Apple Jam
100 - 140 seconds
400 - 2500 g
Pear Jam
100 - 140 seconds
400 - 2500 g
Peach Jam
100 - 140 seconds
400 - 2500 g
PATES
Liver
up to 1 minute
400 - 2500 g
Salmon
up to 1 minute
400 - 2500 g
Anchovy
up to 1 minute
400 - 2500 g
Lobster
up to 1 minute
400 - 2500 g
CHART 02
** The processing of ingredients such as peanut butter or products with similar consistency generates excessive heating
in the cup of the equipment. Therefore, it is mandatory to wait for the cup to cool down before a new process is initiated,
otherwise, irreversible damage may occur.
This equipment has a safety system that prevents the
machine to restart automatically when the electricity is
restored, after a temporary shortage.
The machine has a safety shut-off that stops when the lid
is opened.
In order to avoid incidents, the equipment does not work if
the Protection Lid is not properly placed.
When there is a temporary lack of energy or if the
lid is opened before turning the machine off, repeat the
operation from item 3.1 in order to turn on the machine.
The equipment must be completely cleaned and sanitized:
- Before its first use;
- After daily operation;
- When it is not used for a long period;
- Before putting it into operation after a long time of
inactivity.