TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I would
suggest you install a FOD.
This will save you money in the long run.
Install fuel pump close to UAT. We recom-
mend to make use of a mechanical shut off
valve as well.
Secure all Festo pipes with cable ties.
Install LeFe / Li Po battery in nose.
P-21
Assembly & Operation Manual
Photo 59
Photo 60
Photo 61
Photo 62
Photo 63