background image

TABLE OF CONTENTS

SECTION 1 INTRODUCTION

PURPOSE OF EQUIPMENT .................................................................................................................................   1

USE OF EQUIPMENT ...........................................................................................................................................   1

WARNINGS ...........................................................................................................................................................   1

DESCRIPTION ......................................................................................................................................................   1

SPECIFICATIONS AND FEATURES ......................................................................................................................   3

WORK PLATFORM MAJOR COMPONENT IDENTIFICATION ...............................................................................   4

SECTION 2 OPERATION

OPERATOR QUALIFICATIONS .............................................................................................................................   1

OPERATOR RESPONSIBILITY FOR MAINTENANCE .........................................................................................     1

MAINTENANCE AND INSPECTION SCHEDULE .................................................................................................   1

OWNER’S ANNUAL INSPECTION RECORD .......................................................................................................   1

GENERAL MAINTENANCE HINTS .......................................................................................................................   1

OPERATING CONTROL IDENTIFICATION ..........................................................................................................   1

Base Controls - Electrical ......................................................................................................................................   2

Base Controls - Mechanical ...................................................................................................................................   3

Base Controls - Hydraulic ......................................................................................................................................   4

Platform Controls - Electrical .................................................................................................................................   5

OPERATING PROCEDURES ................................................................................................................................   7

Prestart Checks .....................................................................................................................................................   7

Start and Operation ...............................................................................................................................................   7

Shutdown Procedure .............................................................................................................................................   9

Loading and Tie Down Procedure ..........................................................................................................................   9

LIST OF TABLES

TABLE  2-1. MAINTENANCE SCHEDULE ............................................................................................................ 10

TABLE  2-2. OWNERS ANNUAL INSPECTION RECORD .................................................................................... 11

TABLE  2-3. TIRE SPECIFICATIONS .................................................................................................................... 11

TABLE  2-4. MAXIMUM PLATFORM CAPACITIES ................................................................................................ 11

TABLE  2-5. GENERAL SPECIFICATIONS ........................................................................................................... 12

i

SECTION 2, Page 12

SJKB-40-D, SJKB-40-D/F

JUN. 1999

Mt40-204

Table 2-5. General Specifications

NOTE: For additional specifications, refer to Section 1.

Table 2-6. Standard Operating Times

Mt40-205

 TIRES

Refer to Table 2-3.

 INSIDE TURNING RADIUS (4x2)

7’ 0" (2.13m)

 INSIDE TURNING RADIUS (4x4)

11’ 6" (3.5m)

 OUTSIDE TURNING RADIUS (4x2)

14’ 6" (4.42m)

 OUTSIDE TURNING RADIUS (4x4)

16’ 10" (5.13m)

 UNDERCLEARANCE (4x2)

8" (20.32cm)

 UNDERCLEARANCE (4x4)

7" (17.78cm)

 WHEELBASE

6.3" (1.9m)

 FLOOR LOADING

25 psi(1.76 kg/cm²)

 TAILSWING AT PIVOTAL HEIGHT

ZERO

 TURRET ROTATION

continuous

 MECHANICAL IDLE STOP (Dual fuel Only)
 ENGINE RPM SETTING (Dual Fuel)
 ENGINE RPM SETTING (Diesel & Ford 1.3)

950

1400(idle),2200,3350

1400(idle),1800,3000

 ELECTRICAL SYSTEM (engine)

12 VDC

 BATTERY (engine)

12 Volt, 850 CCA

 LIFT TIME (minimum)(entry height to maximum platform height)

124 Seconds

 LOWERING TIME (minimum)(maximum platform height to entry height)

92 Seconds

 SYSTEM RELIEF PRESSURE (R1)

2600 psi

 TRAVEL SPEED (maximum at stowed height)

3.0 mph (4.8kph)

 TRAVEL SPEED (maximum at elevated height)

0.8mph (1.3kph)

 HYD-RESERVOIR CAPACITY

45 gal. (170 ltr.)

 HYD-SYSTEM CAPACITY

54 gal. (203.8 ltr.)

 FUEL TANK CAPACITY

15 gal. (56.8 ltr.)

 AMBIENT NOISE LEVEL

85 db

FUNCTION TEST

SECONDS

Riser Up

32-36

Riser Down

24-26

Boom Up

24-26

Boom Down

16-18

Boom Extend (S/N 95210 and  above.)

12-16

Boom Extend (S/N 95209 and below.)

30-34

Boom Retract

20-22

Jib Up

12-14

Jib Down

10-12

Platform Rotate Left

7-9

Platform Rotate Right

7-9

Turret Rotate Clockwise

57-63

Turret Rotate Counter Clockwise

57-63

Содержание SJKB-40-D

Страница 1: ... America and Asia please call 800 965 4626 Skyjack Inc Parts Center 990 Vernon Rd Wathena KS 66090 FAX 888 782 4825 For Parts Service in Canada please call 800 265 2738 Skyjack Inc 55 Campbell Rd Guelph Ontario Canada N1H 1B9 FAX 519 837 3883 For Parts Service in Europe please call 31 297 255 526 Skyjack Europe Communicatieweg 29 3641 SG Mijdrecht Netherlands FAX 31 297 256 948 DEC 1999 SECTION 2 ...

Страница 2: ...nd some of its constituents are known to the state of California to cause cancer birth defects and other reproductive harm Operating Maintenance Parts Manual is available through Skyjack Parts Department SECTION 2 Page 13 SJKB 40 D SJKB 40 D F JUN 1999 NOTES ...

Страница 3: ... TURNING RADIUS 4x2 7 0 2 13m INSIDE TURNING RADIUS 4x4 11 6 3 5m OUTSIDE TURNING RADIUS 4x2 14 6 4 42m OUTSIDE TURNING RADIUS 4x4 16 10 5 13m UNDERCLEARANCE 4x2 8 20 32cm UNDERCLEARANCE 4x4 7 17 78cm WHEELBASE 6 3 1 9m FLOOR LOADING 25 psi 1 76 kg cm TAILSWING AT PIVOTAL HEIGHT ZERO TURRET ROTATION continuous MECHANICAL IDLE STOP Dual fuel Only ENGINE RPM SETTING Dual Fuel ENGINE RPM SETTING Dies...

Страница 4: ... 15 20 25 35 45 3 05 4 60 6 10 7 62 10 67 13 72 SECTION 2 Page 11 SJKB 40 D SJKB 40 D F JUN 1999 Table 2 2 OwnersAnnual Inspection Record Table 2 3 Tire Specifications Table 2 4 Maximum Platform Capacities RECOMMENDED HYDRAULIC OILS DO NOT use synthetic or fire resistant oil in this work platform Use ATF Dexron III ESSO or equivalent hydraulic oil For conditions causing oil temperatures below 31 F...

Страница 5: ...ge 10 SJKB 40 D SJKB 40 D F JUN 1999 Table 2 1 Maintenance and Inspection Schedule Mt40c 200 Daily Weekly Monthly 3 Months 6 Months Yearly Engine 11 Fuel leaks 1 á á Engine oil 4 á á Engine RPM 8 á á Fuel filter 7 á á Muffler 2 3 11 á á Air cleaner 1 7 á á Fuel tank cap 2 3 á á Coolant level 1 12 á á Mechanical Struct damage welds 1 á á Parking brakes 2 á á Tires and wheels 1 2 3 á á Guides and we...

Страница 6: ...travel allowances are subject to change without notice 5 Warranty claims must be received by Skyjack within 15 working days from the date of the repair Warranty claims received with insufficient information will be returned for correction or completion 6 Materials returned for warranty inspection must have the following procedures A Carefully packaged to prevent additional damage during shipping B...

Страница 7: ...ional accessories These are listed in Specifications and Features found in this section Operating instructions for these options if required can be found in Section 2 of this manual 1 DEC 1999 SECTION 2 Page 8 SJKB 40 D SJKB 40 D F JUN 1999 WARNING DO NOT operate any control on the operator s control console without your safety devise fastened and properly securing the safety lanyard to the platfo...

Страница 8: ...position Release switch to stop To rotate the platform to the right push and hold this toggle switch to the ð right position Release switch to stop 14 BOOM SPEED CONTROLROTARYSWITCH This rotary switch allows the operator to control the speed of the lifting lowering and rotation functions To reduce the speed of the funtions turn the knob counter clockwise To increase the speed of the functions turn...

Страница 9: ...OP RUN START SELECT SWITCH To start the engineDO NOTdepress the foot switch Turning the switch to the start position will engage the starter once the engine starts release the switch and it will return to the run position To stop the engine turn the switch to the stop position The engine must be running before any functions can be operated 2 ENGINE CHOKE GLOW PLUG SWITCH This switch when held in t...

Страница 10: ...ST be followed Step 1 Firmly pull out the red plunger on the Brake Manifold until the knob remains out Step 2 Grasp the black hand pump plunger and pump rapidly until firm resistance is felt and the brake pressure gauge reaches 700 psi The brakes are now release Although the gauge reading may decrease the brakes will remain released until pressure drops below 300 psi NOTE To return brakes to norma...

Страница 11: ... employer s work rules and related government regulations and be able to demonstrate his her ability to understand and operate THIS make and model work platform in the presence of a qualified person SECTION 2 Page 4 SJKB 40 D SJKB 40 D F JUN 1999 Turret Transportation Lock 2 1 2 1 Ma40 204 Figure 2 4 Turret Transportation Lock 1 TURRET TRANSPORTATION LOCK 2 TURRET TRANSPORTATION LOCK RETAINING PIN...

Страница 12: ...FT RIGHT ROTATION TOGGLE SWITCH This switch controls left and right rotation of the platform To rotate the platform to the left push and hold this toggle switch to the ï left position Release switch to stop To rotate the platform to the right push and hold this toggle switch to the ð right position 8 JIB UP DOWN TOGGLE SWITCH This switch controls the up down movement of the jib To move the jib upw...

Отзывы: