KYJACK, Page 25
JIII eries
ection 1 - cheduled Maintenance
Function Tests
1.2 Function Tests
Function tests are designed to discover any malfunctions
before aerial platform is put into service. he operator
must understand and follow step-by-step instructions
to test all aerial platform functions.
wARNiNG
Never use a malfunctioning aerial
platform. If malfunctions are discovered,
aerial platform must be tagged and
placed out of service. Repairs to aerial
platform may only be made by a qualified
service technician.
After repairs are completed, operator must perform a
pre-operation inspection and a series of function tests
again before putting aerial platform into service.
Prior to performing function tests, be sure to read
and understand Section 2.10 - Start Operation of the
operating manual.
1.2-1 Test Main Power Disconnect witch
1.
At rear of the base, turn main power disconnect
switch to “
” off position.
Result:
Aerial platform functions should not
operate.
1.2-2 Base Control Console
wARNiNG
Ensure that you maintain three points of
contact when using the ladder to mount/
dismount platform.
1.
Use the ladder of aerial platform to access
platform.
2.
Close the gate.
3.
On platform control console, pull out “
”
emergency stop button.
4.
Use the ladder to dismount from platform.
5.
urn main power disconnect switch to “ ” on
position.
Conventional
(Back View)
Compact
(Back View)
Platform/Off/Base
Key Switch
Lower/
Neutral/Raise
Switch
Lower/
Neutral/Raise
Switch
Free-wheeling
Valve
Emergency Stop
Button
Emergency Stop
Button