91
SJ6832 RTE
221844ACAI
Front side
Section 8 – Labels
Description
Label Pictorial
5
Maintenance support procedure
Refer to the operation manual.
1.
Remove all material from platform.
2.
Raise platform until there is adequate clearance to swing down
maintenance support.
3.
Swing maintenance support down from storage bracket into
a vertical position. Lower platform until the bottom end of
maintenance support rests on the lower cross bar.
4.
Maintenance support is now secured.
a.
Turn Main power disconnect switch to off position.
b.
Perform inspection/maintenance.
5.
Turn Main power disconnect switch to on position.
6.
Raise platform until there is adequate clearance to swing up
maintenance support.
7.
Swing maintenance support up and place into storage bracket.
8.
Ensure platform is fully lowered.
1
5
A
7
B
6
8
4
3
2
TM
Front side (continued)
5
Содержание SJ6832 RTE Series
Страница 1: ...221844ACAI August 2021 CE OPERATION MANUAL ROUGH TERRAIN SCISSORS SJ6832 RTE...
Страница 4: ...4 SJ6832 RTE 221844ACAI Notes...
Страница 14: ...14 SJ6832 RTE 221844ACAI Notes...
Страница 20: ...20 SJ6832 RTE 221844ACAI Notes...
Страница 52: ...52 SJ6832 RTE 221844ACAI Notes...
Страница 60: ...60 SJ6832 RTE 221844ACAI Notes...
Страница 76: ...76 SJ6832 RTE 221844ACAI Notes...
Страница 108: ...108 SJ6832 RTE 221844ACAI Notes...
Страница 110: ...110 SJ6832 RTE 221844ACAI Notes...
Страница 111: ......
Страница 112: ...www skyjack com...