Section 3 - Operation
Loading/Unloading
3.9 Loading/Unloading
Know and heed all national, state/provincial and local
rules which apply to transporting of MEWPs.
Only competent/qualified personnel shall operate the
MEWP during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufficient to withstand
maximum MEWP weight.
The transport vehicle must be parked on a level surface
and must be secured to prevent rolling while MEWP is
being loaded or unloaded.
3.9-1 Loading and Tie-down
1.
Lock turret using turret transportation lock
(refer to
Section 3.9-2
).
2.
Turn key switch to “
” off position and remove
key before transporting.
3.
Turn main power disconnect switch to “
” off
position.
4.
Chock MEWP wheels (if necessary).
5.
Remove all loose items.
6.
Anchor down MEWP to transport surface using
tie-down points (refer to
Figure 3-5
).
7.
Secure boom from side-to-side movement using
lower platform mount between boom end and
platform. Do not use excessive downward force
when securing boom section.
8.
Place block underneath platform rotator and
gently lower rotator onto block and secure in
place. Strap must be secured underneath hoses
and cables to avoid damage to MEWP (refer to
Figure 3-6
). Do not use excessive downward force
when securing platform.
WARNING
Inspect MEWP for loose or unsecured
items.
NOTE
For loading and unloading using a winch
line, refer to
Section 2.5
.
Figure 3-5. Tie-down Points
Figure 3-6. Platform Tie-down
If equipped
Содержание 97 100 001
Страница 1: ...TELESCOPIC BOOMS MODEL SJ86T 169370AFA November 2018 OPERATING MANUAL AS...
Страница 48: ...Page 48 December 2007 SJ 86T Notes...
Страница 66: ...Page 66 December 2007 SJ 86T Notes...
Страница 97: ......
Страница 98: ...www skyjack com elig lift l sninger av folk som bryr seg...