background image

TA

B T

EX

T H

ER

E

TA

B T

EX

T H

ER

E

TA

B T

EX

T H

ER

E

TA

B T

EX

T H

ER

E

TA

B T

EX

T H

ER

E

REP
AIRS

SERVICE  TRAINING  MANUAL

14.1 REV  11/19/04

RELAY REPLACEMENT CONTINUED

points.

10.   Reinstall the fiberglass lined heat baffle in place using the six sheet metal screws.  

When placing the heat baffle in place, ensure that no wiring is pinched or caught in the 

control box.

11.  Reinstall the control box on your kiln.  Ensure that all the white feeder wires are con-

nected, that none of the tabs are loose and that the thermocouple push on connectors 

are connected to the proper polarity  (red is negative “-”). Close the control box and 

secure using the six sheet metal screws.

Your installation should be complete!
12.  An empty test firing of your kiln is strongly recommended before firing any valuable 

Page 3

PHOTO  #3

Отзывы: