
protected
SkoFlo Valve Model SF15000NMFB
OPERATION AND MAINTENANCE INSTRUCTIONS
INSTALLATION PROCEDURES:
1.
Install valve so that the flow is in the proper direction. The "IN"
connection and the "OUT" connection are MP20000 connections
for 3/4" tubing, and are marked respectively.
2.
Install an inline filter in the system. Generally, this is located upstream
of the pump. Clean chemical and proper filtering is very important.
A 200 micron size filter is recommended.
START UP PROCEDURES:
1.
Open the supply isolation valve to the flow controller slowly.
2.
Turn the rate adjustment handle until you are at the desired flow rate
3.
The flow controller is now set and further adjustments are not required.
r:\msoffice\excel\e-mail\o_manuals\SkoFlo sf15000nmfa\sf15000nmfa-manual-a1
Page 2 of 13
Содержание SF15000NMFB
Страница 11: ......