![SKLADOVA TEHNIKA Metalurgia Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/skladova-tehnika/metalurgia/metalurgia_instruction-manual_1288656009.webp)
9
INSTRUCTION
for assembling and operation of
solid fuel cookers with integral boiler
Attention!
The design and connection of the heating installation should be obligatory made by an
authorized organization. The installation should conform to all standard documents which are in
force (in reference with the operation and safety).
The cooker with an integral boiler “Plamak B” which you have bought gives you the great
opportunity of heating the nearby premises with radiators.
The maximum allowed temperature into integral boiler -85
o
C.
Maximum working pressure -1 bar.
Tested pressure -2 bar.
Water pipe connector size -1’’.
In the combustion chamber of the cooker there is an integral boiler with heat output
according to Table 1.
When connecting the heating system the following rules and recommendations should be
observed:
Before connecting the installation, it is advisable to calculate the heat loss in the particular
case.
In case of connecting loads with greater heat output, than the declared one in the
referent appendix, a cooling down of the heating surfaces of the integral boiler occurs,
which leads to condensation and pitching
.
The installation should be connected to the atmosphere with an opened expansion
container. Between the cooker and the expansion container not any blocking components
should be connected. This system works under pressure of 1 bar.
Deaeration in each branch and component of the installation should be ensured, in each
moment of its operation, and the cooker as well.
In the installation, immediately near the cooker, in the lowest point, drains tap not less than
½” should be mounted.
All components of the installation should be ensured against freezing, especially if the
expansion container or other parts of it are situated in non heated rooms.
At installations with forced circulation, the pump should be ensured with long term power
supply device – automatic mode /UPS/. We recommend the circulation pump to be switched
on and switched off by means of thermostat, doubled with manual electric switch
When an old installation is used, then it should be repeatedly washed from the accumulated
filths, which could be precipitated on the walls of the integral boiler.
The circulation water should not be drowned off the installation during the non-heating
season.
For cookers with integral boiler it is better to clean the surfaces of the boiler from soot and
resinous matters at least once a month.
By inserting appropriate isolation materials between the wall and the radiators you will achieve
radiation heating whose advantages are proved.
This water heater provides another opportunity -installing a coil into the boiler, for warm
sanitary water.
The manufacturer cannot guarantee the work of the heating installation, except
for the cooker. The design and mounting of the heating installation should be done
by an authorized and legal organization!
In case of incorrect connecting caused by increased pressure an inflation of the integral
boiler a welding rupture occurs. The manufacturer does not take any responsibility for such
defects.