- 4 -
951-171-049
Version 02
EN
Table of contents
4.6
Technical data proximity switch DC version .......................................46
4.7
Technical data proximity switch AC/DC version .................................47
4.8
Technical data proximity switch DC version for SSVM ......................48
4.9
Technical data limit switch ...................................................................49
5.
Delivery, returns, and storage .................................................... 50
5.1 Delivery ..................................................................................................50
5.2 Returns ..................................................................................................50
5.3 Storage ...................................................................................................50
5.4
Storage temperature range .................................................................50
5.5
Storage conditions for parts filled with lubricant ..............................51
5.5.1
Storage period of up to 6 months .......................................................51
5.5.2
Storage period from 6 to 18 months ..................................................51
5.5.3
Storage period exceeding 18 months ................................................51
6. Installation .................................................................................. 52
6.1
Prior to installation ...............................................................................52
6.2
Place of installation ...............................................................................52
6.3
Prerequisites for the correct functioning of the metering devices ..52
6.4
Changing the metering volume internally .........................................53
6.4.1
SSV, SSV-E, SSVL and SSVM metering devices ................................53
6.4.2
Metering devices with bypass bores ...................................................54
6.4.3
SSVD, SSVD-E and SSVDL metering devices....................................55
6.5
External combination of the output in case of SSVL and SSVDL ....56
6.6
Fixation of the metering device at the place of installation ..............57
6.7
Optional mounting bracket for SSV, SSV-E, SSVD and SSVD-E .....58
6.8
Venting of the SSV metering devices and the progressive
lubrication system.................................................................................58
7.
Initial start-up ............................................................................ 59
8. Operation .................................................................................... 59
9. Cleaning ...................................................................................... 60
9.1
Cleaning agents .....................................................................................60
9.2
Exterior cleaning ...................................................................................60
9.3
Interior cleaning ....................................................................................60
10. Maintenance ............................................................................... 61
11. Troubleshooting .......................................................................... 62
12. Repair ......................................................................................... 64
12.1
Remedying a blockade .........................................................................64
13.
Shutdown and disposal ............................................................... 65
13.1
Temporary shutdown ...........................................................................65
13.2
Final shutdown and disassembly ........................................................65
13.3 Disposal ..................................................................................................65
Содержание SSV 10
Страница 77: ...Notes...