
Page 50
EN
4. Installation
7
1
2
6
5
8
4
3
4. Installation
4.1 General remarks
The low meters have to be installed on an
even horizontal or vertical surface. The low
meter’s housing must not be deformed in the
process. Moreover, attention must also be
paid to adequate clearance for the connection
of supply lines and adjustment of the bypass
function.
4.2 Installation
Cabinet installation
The low meters are mounted with 2 bolts
(M 8x15) which are screwed in from to rear.
Tightening torque of low meter
Use the following tightening torque when
mounting the low meter:
SMD 1B/SMD 2/SMD 3 =>
17 Nm
Pos. Description
1 housing
2
plexiglas cover
3 gears
4
throttle screw
5
NAMUR switch (electr. gear monitoring)
6
bypass screw
7
cable duct cover / plate holder
8
connecting screw for modular system
Attention!
When drilling the mounting holes,
always pay attention not only to supply
lines and other units but also to further
sources of danger like moving com-
ponents. Maintain safety clearances
and observe regional installation and
accident-prevention regulations.
Fig. 1
SMD 1B / SMD 2
3
5
1
6
2
4
Fig. 2
SMD 3
Содержание SMD 1B
Страница 37: ...Seite 37 DE...
Страница 39: ...EN Components Lifecycle Manual Flow meter SMD 1B SMD 2 SMD 3...
Страница 75: ...Page 75 EN...
Страница 77: ...D bitm tres SMD 1B SMD 2 SMD 3 FR Composants Cycle De Vie Manuel...
Страница 113: ...Page 113 FR...