Before initial start-up, check that the following point have been dealt
with:
• All instructions followed, in above sections of this chapter
• grounding conductor resistance and substitute leakage currents
checked according threshold of owner usage.
• No impermissibly high side -acting forces impacting on the guide
tube unit.
• Entire stroke area unobstructed so that linear actuators cannot be
driven onto a fixed object.
• All cables secured against pinching and trapping, and properly
connected
• Electrical supply secured
• Operating device connected to the control unit.
Initial start-up
After the installation check has been completed, you can start up the
linear actuators MAX: with the LED on the operating light green,
press the corresponding operating button of the operating device.
Prior to first operation, a professional electrician must perform and
document the following tests and readings:
• Visual condition check
• Functional check of operating features and safety features
• Reading of leakage currents
• Reading of insulation resistance
!
Note!
Additional information concerning inspections and
readings. (
†
Maintenance, chapter 8
) .