background image

SNB-K2A AUTOMATIC EDGE BANDER MANUAL 

12

 

6/2016

 

2.

 

The  operating  distance  of  the  knurl  roll  may  be  adjusted  with  4  screw  bolts 
represented by B (as shown in Fig.9). 

Caution! Don

t touch work piece or edge tape when a work piece entering into or leaving 

the guillotine to avoid possible inquiry. Make sure to cut off the machine

s power before 

servicing. 

Trimming the edge bander from the edge sealing belt disc. 

 

 

 

 

 

 

1.

 

The cutting clamp begins to operate when a work piece reaches the micro switch A 
in Fig.10.  

Glue Tank Components 

 

 

 

 

 

 

 

 

 

 

 

Fig. 10

 

A
 

Fig. 11

 

A
 

B
 

Fig. 12

 

A
 

B
 

Содержание SNB-K2A

Страница 1: ...SNB K2A AUTOMATIC EDGE BANDER MANUAL 1 6 2016 SNB K2A AUTOMATIC EDGE BANDER MANUAL...

Страница 2: ...L 2 6 2016 CONTENTS 1 SAFETY 3 2 SPECIFICATIONS FEATURES 4 3 MACHINE PARTS 6 4 TRANSPORTATION INSTALLATION WIRING 8 5 OPERATION 8 6 MAINTENANCE 17 7 PARTS LIST 18 CAUTION Read these instructions caref...

Страница 3: ...hair covering 9 ALWAYS USE SAFETY GLASSES Also use a face or dust mask if work area is dusty Everyday eyeglasses only have impact resist lenses and they are NOT safety glasses 10 SECURE WORK Use clam...

Страница 4: ...strips with thickness ranges from 0 5mm 3 0mm thick on panels ranging anywhere from 14 40mm thick For tapes up to 3 mm and plastic laminate strips Features a Easy to adjust high quality finishing b Si...

Страница 5: ...o End Cutting Motor 0 16 HP p Glue Tank Motor 0 2 HP q Edge Seal Motor 0 2 HP r Trimmer Speed 11000r min s Conveyor Belt Speed 6m min t Roller holder capacity 24 in diameter u Tank capacity 2 2 Pound...

Страница 6: ...eyor Belt 8 Edge Strip Conveyor 2 Conveyor Belt Height Setting 9 Edge Strip Support Table 3 Buffing Components 10 Edge Strip Conveyor and Cutter Switch 4 Trimming Components 11 Control Panel 5 End Tra...

Страница 7: ...SNB K2A AUTOMATIC EDGE BANDER MANUAL 7 6 2016 A B C D E Fig 3 BACK A Trimming Cutting Adjustment D Glue Tank Adjustment B Buffing Adjustment E Rear End Plate C Glue Tank Bearing Greasing Hole...

Страница 8: ...ectrical Take off the external terminal cover connect 3 live lines separately to L1 L2 L3 neutral line to N earth line to PE fig 4 Make sure to tighten the screws to secure the wires 5 OPERATION 1 Mak...

Страница 9: ...verhang Off is 0 and On 1 3 Automatic side by side end cut components are designed to cut before and after the edge overhang there are two buttons which control the rotation of the milling cutters Off...

Страница 10: ...uld light up 3 Press the button to start the conveyor and then check the direction of movement to make sure it corresponds to the power connection instructions above If not change the position of any...

Страница 11: ...he width of the edge sealing belt may not be more than 2 mm on each side of the work piece Ex The maximum width of the edge sealing belt should be 22mm if the thickness of a work piece is 18mm 4 The e...

Страница 12: ...touch work piece or edge tape when a work piece entering into or leaving the guillotine to avoid possible inquiry Make sure to cut off the machine s power before servicing Trimming the edge bander fro...

Страница 13: ...B Fig 11 4 Pay attention to amount of the glue while sealing and add glue to the tank to maintain the liquid level at 1cm from the edge 5 Turn off the machine to add grease oil Use special oil gun to...

Страница 14: ...l and trim extra edge banding on both sides upper lower You may obtain different sealing effects such as common angle inclined angle or rounded angle according to cutter selected and thickness of edge...

Страница 15: ...ack of the machine as shown in Fig 16 forward and backward The vertical adjustment in radial direction may be made by adjusting bolts F and G in Fig 14 to change the clearance of detector E to be acco...

Страница 16: ...work piece Note the belt should be used at full width to avoid skidding or being damaged 2 The conveyor is operated by three phase motor reducer Wheel handle B in Fig 18 controls the conveyor D to as...

Страница 17: ...belt to complete the sealing process 6 MAINTENANCE 1 Make sure to First Turn off power before any repair and maintenance is started Follow the application requirements 2 It is essential to keep the m...

Страница 18: ...llow up time relay Manual button of rim charge magnet valve Tool magnet valve cut off Manual tool magnet valve cut off Side by side and follow up magnet valve Manual button of side by side and follow...

Страница 19: ...ot sealed Cross sliding block clutch lower SNB6203 17x40x12 2 Normal speed and not sealed Transition steel roller SNB6202 15x32x11 4 Normal speed and not sealed Pressing rubber roller SNB6002 15x32x11...

Страница 20: ...12x28x11 2 Planer Bearing Milling cutter carrier SNBLM12UU 12x21x30 10 Linear Bearing Buffing carrier SNBLM12UU 12x21x30 10 Linear Bearing Side by side vertical guide rail SNBLM12UU 12x21x30 4 Linear...

Отзывы: