Mounting the Control Panel

1. 

Determine mounting location for panel.  If distance 
exceeds the length of either the float switch cables or 
the pump power cables, splicing will be required.  For 
outdoor or wet installation, we recommend the use of an 
SJE Rhombus® liquid-tight junction box with liquid-tight 
connectors to make required connections.  

You must 

use conduit sealant to prevent moisture or gases from 
entering the panel.

2. 

  Mount control panel (mounting flanges are furnished 

with control panel).

3.

   Determine conduit entrance locations on control panel.  

Check local codes and schematic for the number of 
power circuits required.  

 NOTE:

 Be sure the proper power supply voltage, and 

phase are the same as the pump motor being installed.  
If in doubt, see the pump identification plate for electri-
cal requirements.

4.

   Drill proper size holes for type of connectors being used.

 NOTE:

 If using conduit, be sure that it is of adequate 

size to pull the pump and switch cables through.  

You 

must use conduit sealant to prevent moisture or gases 
from entering the panel.

5.

   Attach cable connectors and/or conduit connectors to 

control panel.

FOR INSTALLATION WITHOUT A SPLICE,  

GO TO STEP 11; FOR INSTALLATION REQUIRING  

A SPLICE, FOLLOW STEPS 6-10.

Installation Instructions

6.

   Determine location for mounting junction box according 

to local code requirements.  

Do not

 mount the junction 

box  inside the sump or basin.

7.

    Mount junction box to proper support.

8.

   Run conduit to junction box.  Drill proper size holes for 

the type of conduit used.  Attach connectors to junction 
box.

9.

   Identify and label each wire before pulling through 

conduit into control panel and junction box.  Pull pump 
power cables and control switch cables through connec-
tors into junction box.  Make wire splice connections at 
junction box.

10.

  Firmly tighten all fittings on junction box.  Insure all cable 

connectors are liquid-tight and sealed.

11.

  If a junction box is not required, identify and label cables 

on both float and stripped ends.

12.

  Connect pump and float wires to proper position on ter-

minals.  See schematic inside control panel for terminal 
connections.

13.

 Connect alarm and pump power conductors to proper 

position on terminals.  See schematic inside control 
panel for terminal connections.

 NOTE:

 It is the recommendation of the factory to use 

separate pump and alarm power sources.

VERIFY CORRECT OPERATION OF CONTROL PANEL 

AFTER INSTALLATION IS COMPLETE.

FIGURE 3

Mounting clamp detail

NOTE:

 Double float voltage 

must match pump voltage.

*Super Single®, SJE PumpMaster® Plus, 

or SJE AmpMaster™

  

(See chart on next page to determine pumping range)

Содержание 115

Страница 1: ...perate the pump and high level alarm functions Wide angle pump switch and SJE Double Float applications are illustrated on next page NOTE Options ordered may affect the number of floats and their functions Please reference the schematic provided with the control panel for proper installation Installation of Floats CAUTION If control switch cables are not wired and mounted in the correct order the ...

Страница 2: ... TO STEP 11 FOR INSTALLATION REQUIRING A SPLICE FOLLOW STEPS 6 10 Installation Instructions 6 Determine location for mounting junction box according to local code requirements Do not mount the junction box inside the sump or basin 7 Mount junction box to proper support 8 Run conduit to junction box Drill proper size holes for the type of conduit used Attach connectors to junction box 9 Identify an...

Страница 3: ... the liquid level travels beyond the pump switch or Double Float and reaches the alarm float the audio visual alarm will be activated The alarm horn can be silenced by moving the test normal silence switch to the silence position Alarm System Horn and Indicator When an alarm condition occurs a red light and a horn will be activated If the test normal silence switch is moved to the silence position...

Страница 4: ...ight does not activate replace light with same type Circuit Breaker optional Check each pole of the circuit breaker for proper resistance reading using the following procedure WARNING Disconnect incoming power to panel 1 Isolate the circuit breaker by disconnecting either line side or load side wires 2 Place the ohmmeter leads across the corresponding line and load terminals of each pole 3 With th...

Отзывы: