Mounting the Control Panel
1.
Determine mounting location for panel. If distance
exceeds the length of either the float switch cables or
the pump power cables, splicing will be required. For
outdoor or wet installation, we recommend the use of an
SJE Rhombus® liquid-tight junction box with liquid-tight
connectors to make required connections.
You must
use conduit sealant to prevent moisture or gases from
entering the panel.
2.
Mount control panel (mounting flanges are furnished
with control panel).
3.
Determine conduit entrance locations on control panel.
Check local codes and schematic for the number of
power circuits required.
NOTE:
Be sure the proper power supply voltage, and
phase are the same as the pump motor being installed.
If in doubt, see the pump identification plate for electri-
cal requirements.
4.
Drill proper size holes for type of connectors being used.
NOTE:
If using conduit, be sure that it is of adequate
size to pull the pump and switch cables through.
You
must use conduit sealant to prevent moisture or gases
from entering the panel.
5.
Attach cable connectors and/or conduit connectors to
control panel.
FOR INSTALLATION WITHOUT A SPLICE,
GO TO STEP 11; FOR INSTALLATION REQUIRING
A SPLICE, FOLLOW STEPS 6-10.
Installation Instructions
6.
Determine location for mounting junction box according
to local code requirements.
Do not
mount the junction
box inside the sump or basin.
7.
Mount junction box to proper support.
8.
Run conduit to junction box. Drill proper size holes for
the type of conduit used. Attach connectors to junction
box.
9.
Identify and label each wire before pulling through
conduit into control panel and junction box. Pull pump
power cables and control switch cables through connec-
tors into junction box. Make wire splice connections at
junction box.
10.
Firmly tighten all fittings on junction box. Insure all cable
connectors are liquid-tight and sealed.
11.
If a junction box is not required, identify and label cables
on both float and stripped ends.
12.
Connect pump and float wires to proper position on ter-
minals. See schematic inside control panel for terminal
connections.
13.
Connect alarm and pump power conductors to proper
position on terminals. See schematic inside control
panel for terminal connections.
NOTE:
It is the recommendation of the factory to use
separate pump and alarm power sources.
VERIFY CORRECT OPERATION OF CONTROL PANEL
AFTER INSTALLATION IS COMPLETE.
FIGURE 3
Mounting clamp detail
NOTE:
Double float voltage
must match pump voltage.
*Super Single®, SJE PumpMaster® Plus,
or SJE AmpMaster™
(See chart on next page to determine pumping range)