GTZZ14EJ&16EJ Operation Manual
TRANSPORTING AND LIFTING THE MACHINE
LIFTING THE MACHINE
WITH A CRANE
Follow these requirements when lifting the machine by
crane:
1.
The boom must be stowed while lifting the machine
with a crane.
2.
Ensure the boom is positioned in the same direction
as the chassis travels.
3.
Ensure the controllers and chassis components are
safe and reliable.
4.
Remove all loose parts of the machine.
5.
Determine the center of gravity of the machine.
Figure 8-1
Table 8-1
MODEL
X
Y
GTZZ14EJ
1065.1mm
(41.9 in)
1068.2mm
(42 in)
GTZZ16EJ
1049.2mm
(41.3 in)
1078.3mm
(42.45 in)
6.
Lift the machine as shown in the figure below.
Figure 8-2
7.
Only connect the rigging to the lifting point specified
on the machine. Adjust the rigging to avoid
damaging the machine and to keep the machine
horizontal.
NOTICE
To protect the machine, choose the appropriate
length of rigging.
X
Y
Содержание AB14EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Aug 2020 iv GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank...
Страница 30: ...Aug 2020 3 12 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Aug 2020 4 2 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Aug 2020 5 4 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 90: ...Aug 2020 A 4 GTZZ14EJ 16EJ Operation Manual This Page Intentionally Left Blank MAINTENANCE...