P2: Low pressure protection
LED displays P2
Low pressure protection
Whether wiring connection between low pressure switch and PCB is
connected well or properly.
Whether the low pressure switch is damaged.
Connect well again.
Short-circuit low pressure switch and check whether the
system can work normally.
Whether the cooling system can work as normal.
YES
NO
Check whether the outdoor ambient temperature is too low.
YES
Stop the unit.
NO
Whether refrigerant system leaks.
YES
Leakage detecting: add nitrogen or refrigerant
into the system. “si”,”si” will sound evidently if
leaks heavily. Use soap water(the combination
of water and detergent ) or electronic detector
to detect if leaks slightly.
Replace outdoor main PCB.
NO
NO
YES
Replace low pressure switch .
Connect pressure gauge with the system measuring port.
Replace the EXV, then use high
pressure nitrogen to clean and air the
pipeline, add the refrigerant at last.
Whether EXV works properly or stuck or blocked
YES
NO
NO
NO
78
Содержание SCV-100EA
Страница 1: ...SCV xxEA SERVICE MANUAL AIR COOLED MINI CHILLER UNIT AIR CONDITIONING...
Страница 16: ...7 Wiring Diagram SCV 50EA SCV 70EA 14...
Страница 17: ...SCV 100EA 15...
Страница 18: ...SCV 120EA SCV 140EA SCV 160EA 16...
Страница 28: ...11 Water Pressure Drop SCV 50EA SCV 70EA SCV 100EA Heat exchanger pressure drop water side 26...
Страница 29: ...SCV 120EA SCV 140EA 27...
Страница 30: ...SCV 160EA 28...
Страница 46: ...t e s 1 2 3 3 To access the control panel open the door remove the screw 1 and screw 2 lift the door 3 44...
Страница 88: ...18 Optional Accessories No Name Specification Remark 1 Wired controller KJR 120F Customized 86...
Страница 91: ...Exploded view of unit SCV 50EA 22 7 22 6 22 5 22 4 22 2 22 1 22 3 89...
Страница 94: ...Exploded view of unit SCV 70EA 22 7 22 6 22 5 22 4 22 2 22 1 22 3 92...
Страница 97: ...Exploded view of unit SCV 100EA 25 1 25 2 25 3 25 6 25 7 25 4 25 5 25 9 25 8 95...
Страница 100: ...Exploded view of unit SCV 120EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 98...
Страница 103: ...Exploded view of unit SCV 140EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 101...
Страница 106: ...Exploded view of unit SCV 160EA 25 1 25 2 25 3 25 4 25 5 25 6 25 7 25 9 25 8 25 10 25 11 104...