STEP 5-COMPLETING THE INSTALLATION
4.
Switch on the power supply and check the unit work or not.
5.
Once the indoor unit is assembled, if the gap between the panel and the top of
vehicle is not even, please ask the manufacturer to adjust it according to the
assembly status.
4 screw
wind-path
front panel
front grill
fig 10
filter
Install the healthy filter and air intake grill. Press “PUSH” and lock with clasps.
2.
3.
Check the thermostat position. Make sure the thermostat is routed through the holding guide
and is not touching any metal surface.
Secure the ceiling grille to the ceiling assembly wind-path with 4 screws. (see Figure 10).
To complete the installation and system checkout requirements, the following steps must be
performed.
1.
- 20 -