12. Install wing nut (D, figure 9) as follows:
a. Remove existing hardware from front end of
stone guard.
b. From inside deck, install new
x
carriage bolt (F, figure 9). Then install the cup
(A),
lockwasher
and
nut (C).
Tighten the nut.
c. Thread the wing nut (D) far enough onto the
screw so that
the
locknut (E) can be
threaded on flush with the end of screw.
13. Install the new baffle (A, figure 10) in deck on
stone guard using existing hardware. Hardware
may be installed with nut to inside or nut to
outside.
Figure 10.
A. Battle
B. Carriage Bolt
C. Mower Discharge
14. Install the blower assembly as follows:
a. Pivot cover (B, figure 8) away to expose the
arbor.
b. Align the notch (G, figure 11) with
arbor bracket. Align spacer(C) with notch
figure 2) on arbor bracket. Slide theassembly
into place as shown in figure 13, while
aligning front notch between cup and wing
nut (D, figure 13). Tighten wing nut.
Figure 11.
A. Blower Drive Belt
B. Idler Pulley C. Space
D. Belt Retainer
E. Baffle
F. Driven Pulley
G. Notch
9.
A. cup
q . Lockwasher,
C. Nut.
Wing Nut
E.
F.
Bolt
Over Stone Guard
6