LOAD BANK MANUAL  •  LBD Series  •  page 6 of 16

When normal load drops below 30kW, 
the Load Bank will apply load step #2 
(20kW) to the generator following a 
time delay, bringing a total of 40kW of 
Load Bank load being applied to the 
generator.

Finally, as normal load drops below 
10kW, the last step (20kW) is applied 
to the generator in the same manner as 
before, bringing total generator load to 
a minimum of 60kW.

Upon an increase in normal load, the re-
verse procedure is followed. The points 
at which the Load Bank steps drop out 
will be slightly higher than the pick-up 
points due to the built in hysteresis of 
the CSR relay. When calculating the 
operational points for a Load Bank with 
Automatic operation, Simplex assumes 
the normal load of the building will cause 
the generator to be operating at a 0.8 
power factor, and adjusts the CSR pick-
up points accordingly.

PLC and CSR Example

60kW Load Bank with 5kW Step Resolu-
tion Serving a 100kW Generator:

In this example, the (2) CSRs will be 
set so that CSR1 drops out (opens it’s 
contacts) when 

total

 (including the Load 

Bank load) generator load increases 
above 50kW. CSR2 will be set to pick 
up (close it’s contacts) when 

total

 gen-

erator load increases above 70kW. This 
establishes a “window” between 50kW 
and 70kW, inside of which the PLC takes 
no action to change Load Bank Load.

When total generator load is below 
50kW, the PLC receives a signal from 
CSR1 to increase Load Bank load. The 
Load Bank will increase load in 5kW 
step increments, following time delays 
set according to Load Bank Control 
prints, until total load is greater than 

50kW. Note that if there is no normal 
load on the generator, the entire 60kW 
of Load Bank load may be applied due 
to the setpoints being calculated for a 
0.8 power factor.

When total generator load is above 
70kW, the PLC receives a signal from 
CSR2 to decrease Load Bank load. In 
the same fashion as above, the Load 
Bank will remove it’s load until total 
generator load is below 70kW, or all 
Load Bank load is removed.

Adjusting the CSR and TDR

On the top of each Current Sensing 
Relay (CSR) dust cover there is a black 
adjustment knob (3/4 turn potentiom-
eter) with an arbitrary 0.5-1.0 scale. Turn 
the knob clockwise for a higher current 
pick-up point and counterclockwise for 
a lower current pick-up point.

On the top of  each Time Delay Relay 
(TDR) there is an adjustment knob (one 
turn potentiometer). These relays are 
adjustable from .1 to 30 seconds. Fol-
low the directions on the white stickers 
for each potentiometer to adjust the 
set points.

Do Not allow the Load Bank to 
operate unattended for extended 
periods.

If an automatic test is inter-
rupted by a Load Bank failure, 
do not reset the Load Bank until 
the source of the failure has 
been determined.

Содержание LBD Series

Страница 1: ...er XXXXX XX XX Model LBD XXX April 2011 The information herein is the property of Simplex Inc and or its subsidiaries Without written permission any copying transmitting to others and other use except...

Страница 2: ...rol System 3 Load System 3 PRIMARY INSPECTION 4 INSTALLATION 4 OPERATION 5 Manual 5 Automatic 5 Load Dump 7 COOLING FAILURE SUBSYSTEM 7 MAINTENANCE 7 Each Operation 7 Every 50 Hours or 6 Months 8 TROU...

Страница 3: ...s of unloaded operationofdieselenginegenerators Simplex LBD Series Load Banks are intended for use with water cooled engine generator sets equipped with unit mounted radiators These Load Banks are bui...

Страница 4: ...Section Control power 120V is supplied to the Load Bank by one of the following methods 1 testsourceviaacontrolpowertrans former 2 test source line to neutral or 3 external source LOAD SYSTEM Simplex...

Страница 5: ...nal electrical or mechanicalproblemsduetoreduced clearance 3 Rotateandpushallswitches through all positions to en sure smooth operation 4 Inspect the bottom of crate enclosure for any compo nents that...

Страница 6: ...the load steps which are in the On position Trim is achieved by flipping the load steps On and Off whilethe Master Load is in the On position 7 Adjust source voltage and load Monitor as needed AUTOMA...

Страница 7: ...eratorloadincreasesabove70kW This establishes a window between 50kW and70kW insideofwhichthePLCtakes no action to change Load Bank Load When total generator load is below 50kW the PLC receives a signa...

Страница 8: ...TR contacts 7 4 will close and 7 1 will open Closed OTR contacts 7 4 will illuminate the Over Temperature lamp Open OTR contacts 7 1 will interrupt the power path to the Normal Operation lamp and the...

Страница 9: ...ver the road the electrical connections should be checked for tightness at a shorter than normal time interval See Primary Inspection When troubleshooting Load Bank systems always remove all test sour...

Страница 10: ...he most accurate source of part numbers for your Load Bank When ordering replacement parts for Simplex Load Banks always consult the Parts Legend drawing When contacting the Simplex Service Department...

Страница 11: ...temperature switch FCB Fan circuit breaker Circuit breaker in series with fan control power FCVR Fan control voltage relay Normally energized relay on relay sub panel FM Frequency Meter Monitors freq...

Страница 12: ...itch Normally closed switch used to detect fan failure PSI Pounds per square inch PSR Pump Start Relay RML Remote Master Load Relay RR Run relay RS Remote Load Step Relay RTM Running time meter Keeps...

Страница 13: ...Multiply the answer of step 3 times the square root of 3 1 732 5 Dividetheanswerofstep 4by1000 The answer is the actual kilowatts of loadbeingappliedbytheLoadBank Single Phase 1 Determine the line cu...

Страница 14: ...th the desired amount of kilowatts applied at 1 0 power fac tor The following calculations are used to determine a step kilowatt rating at other than a rated voltage This is accom plished by referenci...

Страница 15: ...watts 1 phase Volts x Amps x PF Volts x Amps 1000 1000 3 phase 1 732 x Volts x Amps x PF 1000 Power Factor expressed as decimal Resistive Load Bank PF is 1 0 Amperes 1 phase KW x 1000 KW x 1000 KW kno...

Страница 16: ...BS IN LBS 250 1 4 20 Grade 5 dry 8 96 250 1 4 20 Grade 2 dry 5 5 66 312 5 16 Grade 5 dry 17 204 312 5 16 Grade 2 dry 11 132 375 3 8 Grade 5 dry 30 360 375 3 8 Grade 2 dry 20 240 437 7 16 Grade 5 dry 5...

Страница 17: ...35 600V 30A 8 AWG 40 T60060 3CR 4 6 AWG 45 600V 60A 2 3 AWG 50 60100 3CR 600V 100A MISCELLANEOUS TERMINALS METERS SWITCHES COILS RELAYS XFORMERS CONNECTION TORQUE SIZE INCH LBS 4 5 6 10 8 19 10 31 1...