This Load Bank is protected against 
cooling failures (high exhaust air tem-
perature which could damage the Load 
Bank or present a safety hazard to the 
operator). The “Normal Operation” 
lamp illuminates when Control Power is 
available and the Cooling System is op-
erating properly. When a cooling failure 
occurs the automatic safety features in 
the Control System immediately remove 
the load from the test source and illu-
minates the “Over Temperature” lamp. 
The malfunction must be corrected and 
the Load Bank must be reset by turning 
the Load Bank “Off” then “On” before 
the load can be re-applied.

The Load Bank consists of two principal 
systems: 

1. Control System

2. Load System

CONTROL SYSTEM

The Control System allows the opera-
tor to apply a desired load to the test 
source and measure the response of 
the test source to the load. This system 
also contains the circuitry utilized to 
disconnect the Load Bank from the test 
source in the event of cooling failures 
and/or improperly positioned operating 
controls. The Control System consists 
of switches and lamps located on the 
Control Panel and logic circuitry located 
in the Control Section.

Control power (120V) is supplied to 
the Load Bank by one of the following 
methods: 

1.  test source via a control power trans-

former, 

2. test source line to neutral, or

3. external source.

LOAD SYSTEM

Simplex LBD Series Load Banks are 
built up in fused branch circuits of not 
more than 70A each and protected by 
600V, 200,000AIC class-T fuses. All 
wiring and devices within the branch 
circuit are rated in accordance with the 
fuse rating. Branch circuit fusing of the 
elements virtually eliminates the danger 
of short circuit of the load elements and 
consequent catastrophic damage to the 
Load Bank. 

These Load Banks utilize either the 
Simplex Pow'r Rod or the Simplex Pow'r 
Web load elements. See Parts Legend 
Drawing for speci

fi

 c elements used.

Pow'r Rod Load Elements

Simlpex Pow'r Rod Load Elements are 
UL recognized. These elements are 
totally enclosed, sealed and weath-
erproof. Pow'r Rod elements consist 
of nickel-chromium resistance wire 
electrically insulated and sealed within 
a metallic sheath. The hazard of electric 
shock to personnel and the danger of 
short circuit by foreign object penetra-
tion are reduced since the elements are 
electrically dead on the outside. They 
will not fatigue from engine or air-blast 
vibrations and will not sag or stretch 
if overheated. The sheath material is 
"incolloy", a rustproof nickel alloy with a 
very high temperature rating (1600°F). 
These elements do not require a cool 
down period.

References to Automatic Op-
eration in this manual should be 
ignored if the Load Bank you are 
using is equipped with Manual 
Load Step Application only.

Содержание LBD Series

Страница 1: ...er XXXXX XX XX Model LBD XXX April 2011 The information herein is the property of Simplex Inc and or its subsidiaries Without written permission any copying transmitting to others and other use except...

Страница 2: ...rol System 3 Load System 3 PRIMARY INSPECTION 4 INSTALLATION 4 OPERATION 5 Manual 5 Automatic 5 Load Dump 7 COOLING FAILURE SUBSYSTEM 7 MAINTENANCE 7 Each Operation 7 Every 50 Hours or 6 Months 8 TROU...

Страница 3: ...s of unloaded operationofdieselenginegenerators Simplex LBD Series Load Banks are intended for use with water cooled engine generator sets equipped with unit mounted radiators These Load Banks are bui...

Страница 4: ...Section Control power 120V is supplied to the Load Bank by one of the following methods 1 testsourceviaacontrolpowertrans former 2 test source line to neutral or 3 external source LOAD SYSTEM Simplex...

Страница 5: ...nal electrical or mechanicalproblemsduetoreduced clearance 3 Rotateandpushallswitches through all positions to en sure smooth operation 4 Inspect the bottom of crate enclosure for any compo nents that...

Страница 6: ...the load steps which are in the On position Trim is achieved by flipping the load steps On and Off whilethe Master Load is in the On position 7 Adjust source voltage and load Monitor as needed AUTOMA...

Страница 7: ...eratorloadincreasesabove70kW This establishes a window between 50kW and70kW insideofwhichthePLCtakes no action to change Load Bank Load When total generator load is below 50kW the PLC receives a signa...

Страница 8: ...TR contacts 7 4 will close and 7 1 will open Closed OTR contacts 7 4 will illuminate the Over Temperature lamp Open OTR contacts 7 1 will interrupt the power path to the Normal Operation lamp and the...

Страница 9: ...ver the road the electrical connections should be checked for tightness at a shorter than normal time interval See Primary Inspection When troubleshooting Load Bank systems always remove all test sour...

Страница 10: ...he most accurate source of part numbers for your Load Bank When ordering replacement parts for Simplex Load Banks always consult the Parts Legend drawing When contacting the Simplex Service Department...

Страница 11: ...temperature switch FCB Fan circuit breaker Circuit breaker in series with fan control power FCVR Fan control voltage relay Normally energized relay on relay sub panel FM Frequency Meter Monitors freq...

Страница 12: ...itch Normally closed switch used to detect fan failure PSI Pounds per square inch PSR Pump Start Relay RML Remote Master Load Relay RR Run relay RS Remote Load Step Relay RTM Running time meter Keeps...

Страница 13: ...Multiply the answer of step 3 times the square root of 3 1 732 5 Dividetheanswerofstep 4by1000 The answer is the actual kilowatts of loadbeingappliedbytheLoadBank Single Phase 1 Determine the line cu...

Страница 14: ...th the desired amount of kilowatts applied at 1 0 power fac tor The following calculations are used to determine a step kilowatt rating at other than a rated voltage This is accom plished by referenci...

Страница 15: ...watts 1 phase Volts x Amps x PF Volts x Amps 1000 1000 3 phase 1 732 x Volts x Amps x PF 1000 Power Factor expressed as decimal Resistive Load Bank PF is 1 0 Amperes 1 phase KW x 1000 KW x 1000 KW kno...

Страница 16: ...BS IN LBS 250 1 4 20 Grade 5 dry 8 96 250 1 4 20 Grade 2 dry 5 5 66 312 5 16 Grade 5 dry 17 204 312 5 16 Grade 2 dry 11 132 375 3 8 Grade 5 dry 30 360 375 3 8 Grade 2 dry 20 240 437 7 16 Grade 5 dry 5...

Страница 17: ...35 600V 30A 8 AWG 40 T60060 3CR 4 6 AWG 45 600V 60A 2 3 AWG 50 60100 3CR 600V 100A MISCELLANEOUS TERMINALS METERS SWITCHES COILS RELAYS XFORMERS CONNECTION TORQUE SIZE INCH LBS 4 5 6 10 8 19 10 31 1...

Отзывы: