SL-863 MHL AVLink/CBUS Analyzer 3.0
User Guide
Simplay-UG-1006-A
© 2014 Simplay Labs, LLC. All rights reserved.
17
CONFIDENTIAL
4.2.
Sink DUT Test Connection
In MHL Sink DUT test, as shown in
, DUT needs to be connected to the MHL OUT port of the SL-863 analyzer
through an MHL 3 cable. A display needs to be connected to the Monitor port through an HDMI cable.
A test fixture SL863PB2 is needed for all the test cases. The fixture needs to be connected between DUT and the MHL
OUT port of the SL-863 analyzer (
).
A/V Display
HDMI Cable
SINK DUT
SL863PB2
MHL Cable
Figure 4.2. Connection for Sink DUT Test