4: Port Numbering and Cabling
DC 900-1331F
61
After you have determined the configuration of ICPs and WAN connector panels in
your Freeway, proceed to
Section 4.1 on page 62
if you have a Freeway 2000 or to
Section 4.2 on page 66
if you have a Freeway 4000.
Figure 4–2:
8-port WAN Connector Panel
Figure 4–3:
16-port WAN Connector Panel
0
7
6
5
4
3
2
1
2756
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
2757
Содержание Freeway 2000
Страница 8: ...8 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 14: ...14 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 20: ...20 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 24: ...24 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 28: ...28 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 30: ...30 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 46: ...46 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 78: ...78 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 84: ...84 DC 900 1331F Freeway 2000 4000 Hardware Installation Guide ...
Страница 86: ...Simpact Inc Customer Service 9210 Sky Park Court San Diego CA 92123 ...