Installation manual ESM-T/X-EV (24 A / 48 A / 72 A)
Page 7/20
SIMON RWA SYSTEME GmbH, Passau
ESM-T/X-EV with power supply
Ventilation control panel (conn24)
The 24 is required for the ventilation function of the electrical control panel. That means that all relevant ventilation
functions (e. g. wind/rain detector) are provided with power via that output.
Charge electronics, LB-1*0
1. Measurement - Current load + 24
2. Measurement - Proving the output v 24
Attention:
Output voltage
at +24 - connection:
21 - 24,5 V DC
+
=V
-
Measurement readings control electronics
All three status outputs of the power supply, EV-** (+24, H, D) are provided with an overload detection. That means, if the
current exceeds a defined measurement at one of these outputs this particular output gets disconnected. After
the
disconnection the control electronics proves whether there is still an overload or not. During this overload phase this fault state
is indicated as a fault indication.
Dublications, also in extracts, are only legal with express authorisation from SIMON RWA SYSTEME GmbH Passau
®
A
max. current capacity:
0,5 A
Charge electronics,
LB-1*0
Central ventilation module,
ES-WS-100
+ 24
Wire disconnected
-
+
Lead accu, 12V
-
+
Lead accu, 12V