3
RANGE
MODEL
CODE
UNIQA REVOLUTION
8110435
COMPLIANCE
Our company declares that
UNIQA REVOLUTION
boilers comply
with the following directives:
– Gas Appliances Directive 2009/142/EC until 20/04/2018
– Gas Appliances EU Regulation 2016/426 from 21/04/2018
– Boiler Efficiency Directive 92/42/EEC
– Low Voltage Directive 2014/35/EU
– Electromagnetic Compatibility Directive 2014/30/EU
– Ecodesign Directive 2009/125/EC
– Regulation (EU) No. 813/2013 - 811/2013
– Energy Labeling Directive 2010/30/CE
1312
Please refer to the technical data plate for the serial number
and year of manufacture.
EC DECLARATION OF CONFORMITY
Pursuant to the "Gas Appliance" Directive 2009/142/EC, the
"Electromagnetic Compatibility " Directive 2014/30/EU, the
"Efficiency" Directive 92/42/EC and the "Low Voltage" Directive
2014/35/EU, the manufacturer, Fonderie SIME S.p.A., at Via
Garbo 27, 37045 Legnago (VR), Italy,
DECLARES THAT
the boilers
UNIQA REVOLUTION
comply with the above EU Directives.
The Technical Manager
(Franco Macchi)
SYMBOLS
a
WARNING
To indicate actions which, if not carried out correctly,
can result in injury of a general nature or may damage
or cause the appliance to malfunction; these actions
therefore require particular caution and adequate
preparation.
f
ELECTRICAL HAZARD
To indicate actions which, if not carried out correctly,
could lead to injury of an electrical nature; these
actions therefore require particular caution and
adequate preparation.
d
IT IS FORBIDDEN
To indicate actions which MUST NOT BE carried out.
m
CAUTION
To indicate particularly important and useful
information.
MANUAL STRUCTURE
This manual is organized as follows.
CHECKLIST
a
WARNING
Before installing and starting up the boiler, make
sure you have done the following:
– handle the boiler in an upright position (see the
“
Handling
” section)
– make the holes for the wall fastening using
an assembly template and spirit level to avoid
any inaccuracies (see the section “
Boiler
installation
”)
– fix the boiler in place, using the cushioning
washers supplied (see the section “
Boiler
installation
”)
– install a Y-filter (not supplied) on the system
return as shown in Fig. 11 in the section “
Main
water circuit
”
– with separate ducts, use the diaphragm
supplied in kit 8089932, inserting it on the
outlet duct, calculating the number of sections
to be folded upwards, as indicated in Fig. 25 in
the section “
Smoke outlet and combustion air
inlet
”
– check the pressure readings at the nozzle
and the CO
2
values (see sections “
Automatic
calibration procedure
” and “
Checking the CO
2
with the chimney sweep function
”).
m
CAUTION
Please always adhere to the instructions in the
manual, as well as current installation regulations.
USER INSTRUCTIONS
TABLE OF CONTENTS
5
DESCRIPTION OF THE APPLIANCE
TABLE OF CONTENTS
11
INSTALLATION AND SERVICING
INSTRUCTIONS
TABLE OF CONTENTS
21