22
6 INSTALLATION
m
CAUTION
External casing seals off the appliance from the
environment in which it is installed. Check regularly,
and always after performing maintenance work, that
the front, side and all gaskets have been correctly
closed and are not worn or damaged.
m
CAUTION
The appliance must only be installed by the
Sime
Technical Service or by qualified professionals
who
MUST wear
suitable protective safety equipment.
6.1
Receiving the product
UNIQA REVOLUTION
appliances are delivered in a single unit
protected by cardboard packaging.
1
Fig. 15
The plastic bag found inside the packaging contains the
following:
– Installation, use and maintenance manual
– Paper template for boiler installation
– Certificate of warranty
– Hydrostatic test certificate
– System booklet
– Bag with expansion plugs
– Overturn indicator (1).
m
CAUTION
The indicator (1) signals when the appliance has been
overturned by lighting up red. If this happens, stand
the boiler vertically and wait at least 24 hours before
starting it. Failure to observe this precaution may
cause damage to the appliance.
d
IT IS FORBIDDEN
Do not leave packaging material around or near
children since it could be dangerous. Dispose of it as
prescribed by legislation in force.
6.2
Dimensions and weight
H
L
P
Fig. 16
Description
UNIQA REVOLUTION
-
W (mm)
400
D (mm)
345
H (mm)
700
Weight (kg)
45