11 COMMISSIONING BOILER CHECKLIST
A suggested method of commissioning the boiler; the actual method can vary according to the boiler make, type and installation. The
boiler must always be installed and commissioned by an approved gas technician. The installer certifies that this Boiler has been
installed to the manufacturer's instructions, has been filled, commissioned and is ready for use.
N°
Description
ü
When done
1
Read carefully the instruction manuals supplied with this boiler.
2
BEFORE INSTALLING T HIS BOILER FLUSH OUT THE PIPES UNTIL CLEAN WATER IS ACHIEVED.
3
Turn off all services to–this boiler - water, gas and power.
Install the boiler as shown in the instructions following and connect all services.
4
Turn on water to fill system, check for leaks regularly and bleed air from all points.
Bleed the air from all the pumps in the system, and rotate the impeller shaft.
5
Check that all radiators valves are open, remove the thermostatic valve heads, fully open all
lockshield valves.
6
Turn ON gas, bleed air out at the isolation valve union. Reseal and check for gas leaks.
Turn gas OFF.
7
Turn electricity on at the power point. At the boiler front panel set the temperature setting to the
lowest setting, switch boiler to ON position.
The “Power on” Indicator should light. Turn the boiler off at the front panel.
8
Turn the room thermostat to the manual ON position set the temperature to a high level so that it
does not switch off during the commissioning phase. The thermostat will unusually click and show an
an indicator in the window.
9
Switch the boiler ON at the boiler front panel control.
10
Boiler should start fan, pump and ignite gas. If it fails first few times this may be just residual air in
the gas line. A noisy water pump indicates there is air in the water pipes.
11
Boiler lights and heats the water. Check gas flame is the correct colour and for gas and water leaks
as the system heats up.
12
Check that heat is going to all radiators through the manual or thermostatic first and return via the
lockshield valve. If not STOP fix NOW and any leaks.
13
Allow the boiler to heat up to the set temperature and switch off. Re-adjust the boiler temperature to
a mid temperature point. CAUTION, If this is connected to a floor heating system. The boiler should re
light and increase the water temperature to the new setting.
14
Check that all radiators are hot all the way up. If the radiator is cold at the top, then there is usually
air in the radiator Bleed the radiator. Balance the system so that all. radiators are hot as according to
the radiator installation manual. Adjust the boiler water temperature.
15
Set the room thermostat to the correct times and temperatures according to the manufacture's
instructions.
16
On completion of the commissioning phase, complete the information sheet at the front of this
manual. Hand over the installation to the owner and demonstrate how the system works plus basic
fault resolution and safety procedures. Make sure that this important document is kept in a safe
accessible place.
Содержание Brava Slim HE 20 R i
Страница 4: ...4 ...
Страница 42: ...42 12 EXPLODED VIEWS Brava Slim HE 20 R i Brava Slim HE 40 R i ...
Страница 43: ...43 Brava Slim HE 20 R e Brava Slim HE 40 R e ...
Страница 44: ...44 Brava Slim HE 20 R i Brava Slim HE 20 R e Brava Slim HE 40 R i Brava Slim HE 40 R e ...
Страница 45: ...45 Brava Slim HE 20 R i Brava Slim HE 20 R e Brava Slim HE 40 R i Brava Slim HE 40 R e ...
Страница 46: ...46 Brava Slim HE 20 R i Brava Slim HE 20 R e Brava Slim HE 40 R i Brava Slim HE 40 R e ...
Страница 55: ...55 ...