86
EN
2.13.2 EMPTYING operations
Domestic hot water circuit:
– close the domestic hot water circuit isolation valve
(prearranged in installation)
– open one or more than one hot water valve to fill and bleed the
domestic hot water circuit.
Boiler:
– loosen the automatic bleed valve (3)
– close the heating circuit isolation valves (prearranged in
installation)
– check that the filling valve (4) is shut-off
– connect a rubber hose to the boiler drain valve (7) and open it
– when it has fully emptied, close the drain valve (7)
– close the automatic bleed valve (3).
4
3
7
Fig. 30
Содержание BRAVA SLIM 40 BF
Страница 134: ...134 ...
Страница 135: ...135 ...
Страница 136: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it ...