background image

60

EN

1  DESCRIPTION OF THE APPLIANCE

1.1 

Characteristics

Brava  One  OF  ErP

are  last  generation  low  temperature  wall 

mounted  boilers  which 

Sime

  has  produced  for  heating  and 

domestic hot water production. The main design choices made 

by 

Sime

 for the 

Brava One OF ErP

 boilers are:

–  the  atmospheric  burner  combined  with  a  copper  heat 

exchanger for heating and a rapid heat exchanger for DHW

–  the open combustion chamber which classifies the "Type B" 

boiler in relation to the room where it is installed

–  the  command  and  control  microprocessor  electronic  board 

not only allows a better management of the heating system 

and the system for domestic hot water production but it can 

also  be  connected  to  air  thermostats  or  a  remote  control 

(with  an  Open  Therm  protocol),  an  auxiliary  sensor  for  the 

connection of any possible solar kits or to an external sensor. 

If this is the case, the boiler temperature varies on the basis 

of the external temperature according to the selected optimal 

climatic curve allowing for significant energy and economic 

savings.

Other special features of the 

Brava One OF ErP

 boilers are:

–  the anti-freeze function which activates automatically if the 

temperature  of  the  water  inside  the  boiler  falls  below  the 

threshold of the value set at parameter "tS 1.0" and , if there 

is an external sensor, if the external temperature falls below 

the threshold of the value set at parameter "tS 1.1".

–  the anti-blocking function of the pump and diverter valve. This 

activates automatically every 24 hours if no request for heat 

has been made

–  the chimney sweep function lasts 15 minutes and makes the 

job  of  the  qualified  technician  easier  when  measuring  the 

parameters  and  combustion  efficiency  and  when  checking 

gas pressure at the nozzles

–  screen  display  of  the  operating  and  self-diagnostic 

parameters  with  error  code  display  when  the  fault  occurs. 

This makes repair interventions easier and allows appliance 

operation to be restored correctly.

1.2 

Check and safety devices

The 

Brava One OF ErP

  boilers  are  equipped  with  the  following 

check and safety devices:

–  thermal safety sensor 100°C

–  smoke thermostat

–  3 bar relief valve

–  heating water pressure switch

–  delivery sensor

–  DHW sensor.

IT IS FORBIDDEN

to commission the appliance with safety devices which 

do not work or which have been tampered with.

DANGER

Safety  device  may  only  be  replaced  by  professional 

qualified personnel using 

Sime

 original spare parts.

1.3 

Identification

The 

Brava One OF ErP

 boilers can be identified by means of:

1  Packaging  label: 

this  is  located  on  the  outside  of  the 

packaging  and  provides  a  code,  the  serial  number  of  the 

boiler and the bar code

2  Energy  Efficiency  Label: 

this  is  positioned  on  the  outside 

of  the  packaging  to  notify  the  User  of  the  level  of  energy 

savings  and  reduced  environmental  pollution  produced  by 

the appliance

3  Technical Data Plate: 

this is located inside the front panel of 

the boiler and provides the technical specification, appliance 

performance and any other information required by law.

1

3

1

I                  II

 A
 B
 C
 D
 E
 F
 G

2015

811/2013

Cod. 6244745

   

dB

 

  

kW

 A

++

 A

+

 A
 B
 C
 D
 E
 F
 G

2

3

2

Fig. 1

KEY:

Packaging label

Energy Efficiency Label

Technical Data Plate

Содержание Brava One 25 OF ErP

Страница 1: ...parede de baixa temperaturao Low temperature wall mounted boiler Навесные низкотемпературные котлы MANUAL DE INSTALACIÓN Y MANTENIMIENTO MANUAL PARA A INSTALAÇÃO E A MANUTENÇÃO INSTALLATION AND MAINTENANCE MANUAL ИНСТРУКЦИЯ ПО МОНТАЖУ И ТЕХНИЧЕСКОМУ ОБСЛУЖИВАНИЮ BRAVA ONE OF ErP EN PT ES RU ...

Страница 2: ...1 3 1 Technical Data Plate 61 1 4 Structure 62 1 5 Technical features 63 1 6 Main water circuit 64 1 7 Sensors 64 1 8 Expansion vessel 64 1 9 Circulation pump 65 1 10 Control panel 65 1 11 Wiring diagram 66 2 INSTALLATION 67 2 1 Receiving the product 67 2 2 Dimensions and weight 67 2 3 Handling 67 2 4 Installation room 67 2 5 New installation or installation of a replacement appliance 68 2 6 Clean...

Страница 3: ...ion operations issue a statement of compliance with national and local Technical Standards and Legislation in force RESTRICTIONS d IT IS FORBIDDEN The appliance is not to be used by children or unassisted disabled persons Do not use electrical devices or appliances such as switches electrical appliances etc if you can smell fuel If this should happen open the doors and windows to air the room clos...

Страница 4: ...tically every 24 hours if no request for heat has been made the chimney sweep function lasts 15 minutes and makes the job of the qualified technician easier when measuring the parameters and combustion efficiency and when checking gas pressure at the nozzles screen display of the operating and self diagnostic parameters with error code display when the fault occurs This makes repair interventions ...

Страница 5: ...NO YEAR OF MANUFACTURE SERIAL NUMBER NAME MAX USEFUL OUTPUT 50 30 C MAX OPERATING PRESSURE MAX USEFUL OUTPUT 80 60 C MAX HEAT INPUT WATER CONTENT IN BOILER FLOW RATE MAX OPERATING PRESSURE ELECTRICAL SUPPLY MAXIMUM ABSORBED POWER MAX HEAT INPUT COUNTRY OF INTENDED INSTALLTION APPLIANCE CATEGORY D H W CONTENT Fig 2 m CAUTION Tampering with removing or failing to display the identification plate or ...

Страница 6: ...ition detection electrode 6 Diverter valve 7 System filling unit 8 Domestic hot water sensor 9 Control panel 10 Secondary heat exchanger 11 Gas valve 12 Domestic water filter and flow regulator 13 System relief valve 14 Boiler drain 15 System pump 16 Water pressure switch 17 Automatic bleed valve 18 Burner 19 Primary heat exchanger 20 Expansion vessel 21 Smoke outlet Fig 3 ...

Страница 7: ...FORMANCE HEATING Heating seasonal energy efficiency class C Heating seasonal energy efficiency 79 Sound power db A 48 DOMESTIC HOT WATER Domestic hot water energy efficiency class B Domestic hot water energy efficiency 73 Stated domestic hot water profile load XL ELECTRICAL SPECIFICATIONS Power supply voltage V 230 Frequency Hz 50 Absorbed electrical power Qn max W 79 Absorbed electrical power at ...

Страница 8: ...of Temperature Detected Resistance Examples of reading TR 75 C R 1925Ω TR 80 C R 1669Ω TR 0 C 1 C 2 C 3 C 4 C 5 C 6 C 7 C 8 C 9 C Resistance R Ω 0 C 27279 17959 12090 8313 5828 4161 3021 2229 1669 1266 973 26135 17245 11634 8016 5630 4026 2928 2164 1622 1232 25044 16563 11199 7731 5440 3897 2839 2101 1577 1199 24004 15912 10781 7458 5258 3773 2753 2040 1534 1168 23014 15289 10382 7196 5082 3653 26...

Страница 9: ...these buttons for more than 30 seconds generates a fault on the display without preventing boiler operation The warning disappears when normal conditions are restored 3 DISPLAY l SUMMER This symbol appears when the boiler is operating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols l and n are flashing this indicates that the chimney sweep fun...

Страница 10: ...re switch TA Air thermostat SE External sensor CR Remote control instead of air thermostat To connect the Air Thermostat or alternatively the Remote Control remove the bridge between terminals 5 6 Fig 8 m CAUTION Users must Use an omnipolar cut off switch disconnect switch in compliance with EN Standards Respect the connections L Live N Neutral Ensure that the special power cable is only replaced ...

Страница 11: ... 26 2 3 Handling Once the packaging has been removed the appliance is to be handled manually tilting it slightly lifting it and applying pressure in the points indicated in the figure Fig 11 d IT IS FORBIDDEN DO NOT hold onto the appliance cladding but use the solid parts such as the base and the rear structure a DANGER Use suitable tools and accident protection when removing the packaging and whe...

Страница 12: ...m it is recommended that the user puts a descaling additive into the water system allows the system to work with the generator active for a few days drains the dirty water from the system and flushes the system with clean water once or more than once If the old generator has already been removed or is not available replace it with a pump to circulate water in the system and then proceed as describ...

Страница 13: ...ntire GAS CONVERSION phase of the appliance Boiler connection to the gas mains must be carried out in full compliance with installation Standards in force Before connecting the boiler to the gas mains the user must ensure that the type of gas is correct for the appliance the pipes are clean the gas supply pipe is the same dimension as or greater than that of the boiler fitting G3 4 and with a load...

Страница 14: ...092281 m CAUTION The maintenance interventions described must ONLY be carried out the professionally qualified personnel a DANGER Before carrying out any interventions described set the main system switch to OFF close the gas valve make sure that no hot parts inside the appliance are touched OFF Fig 16 To facilitate introduction of the connection wires of the optional components into the boiler re...

Страница 15: ...ns provided on the packaging of the product itself Climatic curve Delivery temperature 20 15 10 5 0 10 15 5 20 80 90 70 60 50 40 30 20 C C K 9 K 6 K 4 5 K 3 K 2 2 K 1 5 K 0 75 External temperature Fig 21 m CAUTION If there is an external sensor turn the heating knob t until the required curve K has been selected within the rangeK 0 0 K 9 0 in order to select the optimal climatic curve for the syst...

Страница 16: ...alves Heating circuit open the isolation and air bleeding valves in the highest points of the system loosen the automatic bleed valve 3 open the isolation valves of the heating circuit if present open the filling valve 4 and fill the heating system until a pressure of 1 1 2 bar is shown on the display close the filling valve 4 check that there is no air in the system by bleeding all the radiators ...

Страница 17: ...water valve to fill and bleed the domestic hot water circuit Boiler loosen the automatic bleed valve 3 close the heating circuit isolation valves prearranged in installation check that the filling valve 4 is closed connect a rubber hose to the boiler drain valve 7 and open it when it has fully emptied close the drain valve 7 close the automatic bleed valve 3 4 3 7 Fig 28 ...

Страница 18: ...han one hot water tap The boiler will work at maximum power until the taps are closed if there is a fault the message AL will appear on the display followed by the fault code eg 06 no flame detected m CAUTION If the boiler has blocked restore the start conditions by pressing and holding the button o R for more than 3 seconds This operation can be carried out no more than 6 times close the taps ope...

Страница 19: ...lar power input 0 4 1 0 tS 0 3 Gas Type Configuration 0 G20 1 G31 0 1 1 0 or 1 tS 0 4 Combustion configuration 0 sealed chamber with combustion control 1 open chamber with smoke thermostat 2 low NOx 0 2 1 1 tS 0 8 External sensor value correction 5 5 C 1 0 DOMESTIC HOT WATER HEATING tS 1 0 Boiler Antifreeze Threshold 0 10 C 1 3 tS 1 1 External Sensor Antifreeze Threshold Disabled 9 5 C 1 2 tS 1 2 ...

Страница 20: ...s the button o R for approximately 3 seconds to start the appliance up again 3 5 Fault malfunction codes Type No Description AL 01 Smoke thermostat AL 02 Low water pressure in system AL 04 Domestic hot water sensor fault AL 05 Delivery sensor fault AL 06 No flame detection AL 07 Sensor or safety thermostat intervenes AL 08 Fault in the flame detection circuit AL 09 No water circulating in the syst...

Страница 21: ...0 99 bar 0 1 TABLE OF COUNTER DISPLAYED Type No Description Range U M Step CO 0 0 total no of boiler operating hours 0 99 h x 1000 0 1 from 0 0 to 9 9 1 from 10 to 99 CO 0 1 total no of burner operating hours 0 99 h x 1000 0 1 from 0 0 to 9 9 1 from 10 to 99 CO 0 2 total no of burner ignitions 0 99 h x 1000 0 1 from 0 0 to 9 9 1 from 10 to 99 CO 0 3 total no faults 0 99 x 1 1 CO 0 4 total no of ti...

Страница 22: ...e button once again to make the boiler operate at maximum power If the gas pressure values are correct it is possible to determine the combustion data and take a reading of the combustion efficiency as provided for by legislation in force press the button s to exit the Chimney sweep Procedure The boiler water delivery temperature will appear on the display close the taps opened previously and chec...

Страница 23: ... once the value indicated in the table has been reached press the button sfor approximately 2 seconds to confirm the value which will then flash once pressandholddownthebuttonsoandsatthesametimefor approximately 6 seconds until the water delivery temperature appears on the display and the boiler shuts down starts up close the valves which were opened previously 3 8 Gas conversion Brava One OF ErP ...

Страница 24: ...de is essential for the correct detection of current ionization apply the label indicating the new gas configuration on the technical data plate 11 on the inside of the front panel carry out the Automatic calibration procedure and then refit the front panel 2 securing it with the two screws 1 1 2 14 Fig 39 3 9 Automatic calibration procedure This procedure MUST BE CARRIED OUT after replacing the n...

Страница 25: ...to the parameter section if not already there by pressing the buttons and o approximately 5 seconds at the same time until tS installer appears on the 2 digits of the display which alternate with 0 1 parameter number and a 2 set value keep the button pressed and scroll through the parameters until reaching parameter tS 4 9 press the button oto confirm approximately 3 seconds and access the default...

Страница 26: ...ure press the button o twice the message P00 will appear on the display press the buttons or until the pressure value indicated in the table appears on the pressure gauge once the value indicated in the table has been reached press the button sfor approximately 2 seconds to confirm the value which will then flash once pressandholddownthebuttonsoandsatthesametimefor approximately 6 seconds until th...

Страница 27: ...aning the heat exchanger To clean the heat exchanger remove the two screws 1 pull the front panel 2 forwards and release it from the top by lifting it 1 2 Fig 43 remove the four screws 3 and remove the front panel 4 from the combustion chamber working carefully so as not to damage the gasket or the panel insulation 3 4 5 6 Fig 44 if there is any dirt on the heat exchanger 5 fins protect the burner...

Страница 28: ... input 0 tS 0 3 Gas Type Configuration 0 G20 1 G31 0 or 1 tS 0 4 Combustion configuration 0 sealed chamber with combustion control 1 open chamber with smoke thermostat 2 low NOx 1 To enter Parameter setting and display refer to the indications provided in the specific section Once the parameters in the table have been set you must carry out the Automatic calibration procedure If the gas valve and ...

Страница 29: ...43 Open Therm communication fault Check the electrical connection of the remote control AL 44 Anomaly inside electronic board Replace the board AL 62 The self calibrating procedure must be carried out Carry out the self calibrating procedure see the specific section AL 72 Incorrect positioning of the delivery sensor Check that the delivery sensor is attached to the delivery pipe AL 74 Fault in the...

Отзывы: