
Before placing your product on the counter, place the product
upside down on the counter in order to adhere the sealing and heat
insulating materials (Fig. 22).
When placing the worktop product on the counter,
be careful not to damage it.
Separate the heat insulating material from the tape and attach it to
1 - Elbow pipe (short)
Install the elbow pipe as in the arrow mark (Fig. 24).
Fig. 22
Fig. 23
1
Fig. 24
Assembly
11.02.2021
FLOW-IN PRO USER MANUAL EN
30