Instruction Manual StackGuard
10266E/1
31
5
Servicing
Whenever the protective covers marked with the symbol
are removed,
Class 3R laser radiation can be emitted. So these covers may be removed only
in the deenergized state and only by authorized service personnel!
Whenever doing work on uninsulated parts of the installation, be absolutely
sure to wear temperature-resistant gloves!
For the following servicing work, fold-out assistance is provided in Section 11
of the Appendix.
5.1
Servicing schedule
After the installation has been started up, the first two servicing chores listed
here (Checking the zero and reference points) should be carried out at 14-day
intervals. If the check values are in order, the interval can be successively
increased to the intervals listed in the table :
When Who What
Purpose
Every 3
months / at
every
opportunity
User
Checking the zero
and reference points
(
→
Section 5.2)
Annually or
as needed
User
Replacing filter
(KZTN3) for purge air
blower
(
→
Section 5.3)
As needed
or after a
warning
message
User
→
Section
Annually or
as needed
User
Replacing the purge
air filter (
→
Section
Absolutely necessary for
maintaining measuring
accuracy
Every 10
years
Service
technician
Replace the back-up
battery in the
photometer
Necessary to make sure the
internal clock keeps running
during power outages
Table 2: Servicing schedule.