Signature Hardware GLENLEY 925471 Скачать руководство пользователя страница 11

11

G L E N L E Y   P R E S S U R E   B A L A N C E

REMOVAL OF CARTRIDGE 

FOR MAINTENACE

1. Remove the face plate, handle, and housing.

2. Release the top cover with wrench in 

counterclockwise direction

5. Position the pins correctly and match the body 

position holes to �t in securely.

3. Grasp the cartridge stem and pull out the cartridge, 

making note of correct position for seal.

4. Place the cartridge into the transfer valve body and 

ensure the seals are in the correct position.

6. Reassemble the top cover to the transfer valve by 

turning it clockwise until hand tight. Then turn 

additional 1/2 turn with a wrench.

Note:

 Make sure the handle stem is positioned 

correctly.

SHOWER HEAD AND BODY SPRAYS

SKU: 925471

Содержание GLENLEY 925471

Страница 1: ...all the required materials that are needed for the installation G L E N L E Y P R E S S U R E B A L A N C E SHOWER HEAD AND BODY SPRAYS SKU 925471 REVISED 03 17 2020 CODES 153845 316693 330696 500449...

Страница 2: ...on plumbing methods illustrated below Copper IPS Remove the existing handle and valve trim before replacing your valve Please follow all local building and plumbing codes Use a wire tting brush to tho...

Страница 3: ...s and will be the main source of support for the valve The plaster guard 1 remains attached to the valve 3b Thick Wall Installation Are usually built up with materials such as cement board drywall til...

Страница 4: ...outlet Notes The hot water supply lines go into the H inlet and the cold water supply lines go into the C inlet Cold Cold Cold Hot Hot Hot reverse installation reverse installation normal installatio...

Страница 5: ...ter allowing water to ow from shower outlet until all foreign matter has cleared the line Shut o water at faucet 2 1 10 Place the plaster guard 1 onto the valve body 2 Note Be sure to position the pla...

Страница 6: ...ace the cartridge 1 Note Install cartridge 1 correctly for proper handle rotation 1 2 13 Removing the limit stop ring remember the position of the limit stop ring 1 on the cartridge assembly 2 Remove...

Страница 7: ...4 38 Supply Pipe Floor Line Plastic Plate Hot Cold DIVERTER VALVE INSTALLATION 1 Shut o the main water supply Flush all pipes thoroughly before installation 2 The distance from the supply valve center...

Страница 8: ...tlets on the diverter valve providing 3 separate connections Each outlet will connect one end xture for example showerhead hand shower and the tub spout 2 The outlet sequence will start from the top t...

Страница 9: ...s stem extension and handle Outlet 1 Inlet Outlet 2 Outlet 3 2 Screw nut onto thread section of valve body Insert the brass stem extension to valve body Tighten screw 3 Position escutcheon on valve bo...

Страница 10: ...shower arm Thread the ball onto the shower arm clockwise 4 Run water to ush out any debris G L E N L E Y P R E S S U R E B A L A N C E 6 Install each of the body jets by threading them into the prepar...

Страница 11: ...n holes to t in securely 3 Grasp the cartridge stem and pull out the cartridge making note of correct position for seal 4 Place the cartridge into the transfer valve body and ensure the seals are in t...

Отзывы: