www.signamax.com
3
3.
Pull down the DIN-Rail bracket to the DIN-Rail track
and check if it is mounted tightly on the DIN-Rail
track.
2.
Insert the top of the DIN-Rail bracket to the DIN-Rail
Страница 1: ...Quick Start Guide I 100 Series Switches...
Страница 2: ...of a Class 1 Laser Product and are inherently eye safe in normal operation However you should never look directly at a transmit port when it is powered on Warning When selecting a fiber SFP device con...
Страница 3: ...nt and Warranty Card Mount the Switch 2 Part Number RJ 45 Ports PoE Ports SFP Ports SI10011 8 Gigabit 8 2 SI10021 8 Gigabit N A 2 SI10031 4 Gigabit 4 2 SI10041 4 Gigabit N A 2 SI10050 6 10 100 4 N A N...
Страница 4: ...www signamax com 3 3 Pull down the DIN Rail bracket to the DIN Rail track and check if it is mounted tightly on the DIN Rail track 2 Insert the top of the DIN Rail bracket to the DIN Rail track...
Страница 5: ...ed and connect it to the grounding point on the switch rear panel Then connect the other end of the wire to ground Caution The earth connection must not be removed unless all supply connections have b...
Страница 6: ...to the transceiver ports The following transceivers are supported 1000BASE SX 065 79SXMG 1000BASE LX 065 79LXMG 1000BASE ZX 065 79ZXMG 1000BASE LHX 065 79LXEDMG 3 As connections are made check the por...
Страница 7: ...ed or the switch has failed LINK ON Port has a valid link BLINKING Port has network activity OFF The link is down PoE ON A PoE device is connected and delivered PoE power BLINKING PoE Error short circ...
Страница 8: ...999 NW 159th Dr Miami FL 33169 800 446 2377 305 944 7710 CONNECT WITH US www signamax com...