C-DIAS PROCESSOR MODULE
CCP 621
27.03.2020
Page 3
CAN Bus Termination ........................................................... 22
Wiring and Mounting Instructions ....................................... 23
Ground ......................................................................................... 23
Shielding ...................................................................................... 24
ESD Protection ............................................................................ 24
Mounting ...................................................................................... 25
Working With and On the CCP 621 ...................................... 25
Process Diagram ................................................................... 26
System Boot Checkpoints .................................................... 27
Status and Error Messages .................................................. 28
Application Exceptions ......................................................... 36
SRAM and IRQ routines ............................................................. 36
SRAM and Consistency of Changed Data ................................ 36
The File System Does Not Support Safe Writing via SRAM ... 36
Data Breakpoint .......................................................................... 36
Note on SRAM Behavior ....................................................... 37
Recommended Shielding for VARAN .................................. 38
Wiring Outside of the Control Cabinet ..................................... 40
Содержание CCP 621
Страница 10: ...CCP 621 C DIAS PROSESSOR MODULE Page 8 27 03 2020 2 Mechanical Dimensions...
Страница 12: ...CCP 621 C DIAS PROSESSOR MODULE Page 10 27 03 2020 4 Connector Layout...
Страница 21: ...C DIAS PROCESSOR MODULE CCP 621 27 03 2020 Page 19 9 Configuration of the Process Module...
Страница 28: ...CCP 621 C DIAS PROSESSOR MODULE Page 26 27 03 2020 13 Process Diagram...