![Sigineer Power M12048D Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/sigineer-power/m12048d/m12048d_user-manual_1267388020.webp)
www.sigineer.com
20
Note: When the Program 12: DC to AC Transfer Voltage value is set, the Program 21: Low Battery Cut-Off
Voltage value must be lower than that.
Program 22: RS485 Communication Address
Default 001. 001-255. Settable. It is for external solar charger expansion.
Program 23: Battery Equalization
If “Flooded” or “User-Defined” is selected in program 05, this program can be set up. The Equalization is
not available for AGM batteries.
Program 24: Battery Equalization Voltage
Model #
Default Value
Resettable Range
6KW 12KW
58.4V
48-58.4V
Program 25: Battery Equalized Time
Default 60min, 5min~900min Settable
Program 26: Battery Equalized Timeout
Default 120min, 5min~900min Settable
Program 27: Equalization Interval
Default 30days, 1 day~90 days Settable
Program 28: Equalization Activated Immediately
If equalization function is enabled in program 23, this program can be set up. If “Enable” is selected in this
program, it will activate battery equalization immediately and LCD main page will shows “
Eq
”.If “Disable”
is selected, it will cancel equalization function until next activated equalization time arrives based on
program 27 setting. At this time, “
Eq
” will not be shown in LCD main page
Program #
Description
ICON
01 Power Priority for AC
Loads
Utility Priority
01 Power Priority for AC
Loads
Solar Priority
01 Power Priority for AC
Loads
SBU Priority
02 Maximum Charging
Current
Max PV+Utility Charging Current
03 AC Input Voltage
Range
Appliance Mode (default)
03 AC Input Voltage
Range
UPS Mode