EAN-1500-OEM-Startup-Guide
© SightLine Applications, Inc.
4
5.1
Power Connections
REV H and later 1500-AB boards have a single power switch. REV E and earlier boards have a dual
power switch. REV H and later boards are immediately powered on when power is connected. A green
light indicates the 1500-AB is powered on.
To prevent voltage spikes to the board, plug in the 1500-AB board power adapter (SLA-PWR-B05V) to
an AC power source first.
To power-on the 1500-OEM board For Rev H and later AB boards, place the switch in the position
shown in
Figure 4
.
To power-on the 1500-OEM board For Rev E and earlier AB boards, place both switches in the position
shown in
Figure 5
.
A blue light on the 1500-AB board and a green light on the 1500-OEM indicate that all the boards are
powered on.
Figure 4: 1500-OEM Bench Setup with 1500-AB Board (Rev H and later)
Figure 5: 1500-AB Board Dual Power Switches (Rev E and earlier)
Power is on to
the 1500-OEM
Power is on to
the 1500-AB
SLA-PWR-B05V
SLA-CAB-ETH0
AB board power ON
1500-OEM power ON
Power LED (D2)
Power LED (D3)
Network Connection LED
1500-OEM power ON
SLA-PWR-A05V
AB board power ON
Switch Position
ON
ON