CONFIGURATION
3-5
SIG-QG-20-02
JANUARY 2021
Version : A.2
NOTE
Changing the ATCS Railroad, Line, Group, Display or Subnode or CPU
II+/CPU III subnode will cause the Display to disconnect from the CPU and
then reconnect.
3.3
GCP PROGRAMMING
This screen is used to set parameters that affect the operation of the GCP and its ability to detect trains
and provide a constant warning time. The design on the circuit plans for the crossing warning system
determines the programming of the GCP.
WARNING
PROGRAM CHANGES MUST BE PERFORMED IN ACCORDANCE WITH
RAILROAD PROCEDURES. SYSTEM OPERATION MUST BE VERIFIED
PRIOR TO PLACING SYSTEM IN SERVICE OR FOLLOWING
PROGRAMMING, HARDWARE OR WIRING CHANGES.
To edit the parameters, first unlock and confirm local user presence (see Section 6.1.5.1). The fields will
now be editable.
NOTE
If the Security Enabled is set to Maintainer, the correct Maintainer password
has to be entered in the WebUI in order to edit parameters. If the default
password is used, the GCP programming parameters will remain locked.
Содержание WEBUI
Страница 16: ...CONNECTING TO THE WEBUI 1 16 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...
Страница 30: ...SYSTEM VIEW 2 14 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...
Страница 33: ...CONFIGURATION 3 3 SIG QG 20 02 JANUARY 2021 Version A 2 Figure 3 3 WebUI Site Configuration GCP 5000 ...
Страница 40: ...CONFIGURATION 3 10 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...
Страница 44: ...CALIBRATION ADJUSTMENT 4 14 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...
Страница 68: ...SOFTWARE UPDATES 6 12 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...
Страница 72: ...CPU III WEBUI 8 2 SIG QG 20 02 JANUARY 2021 Version A 2 This page intentionally left blank ...