Key
C = Check, R = Replace
User unit
Part
Test
Action
12 mth
2 yr
5 yr
Liquid cooling system
Coolant level inspection
If too low, top off
C
Charge plug/cable
Inspect cable and plug
Inspect cable and plug
C
Coolant pump (front)
Check for operation
Periodic replacement
C
R
Radiator fans (x2)
Inspect and clean
Clean/replace as
required (1)
C
R
Isolated power unit
Part
Test
Action
12 mth
2 yr
10 yr
Front door filters
Check filter
Clean/replace as
required (1)
C
R
Primary Transformer
Inspect electrical
connections for signs of
heat or corrosion
Ensure connections are
tight and firm
C
Rear door fans + filter (x2)
•
Check filter
•
Check for airflow
Clean/replace as
required (1)
C
R
UPS battery
Check battery controller for
alerts/alarms
Check and replace batteries
as required
C
R
Notes:
1. Filter cleaning/replacement is environment dependent. Perform more frequently in higher pollution environments.
2. Used batteries must be disposed of in accordance with applicable national and local environmental regulations.
They can also be returned to the manufacturer.
All units
Part
Test
Action
12 mth
2 yr
5 yr
Tilt sensor/door switches
Verify correct operation
If it does not operate
correctly, troubleshoot
C
Electrical safety checks
See section
Electrical Safety Checks
C
Maintenance intervals
Maintenance Manual
| VersiCharge Ultra 175™
5