Buss Connector Detail

400 Amp Panels

NOTE ORIENTATION 

OF NEUTRAL CONNECTOR

250 Amp 54 Circuit

250 Amp 66 Circuit

250 Amp 42 Circuit

250 Amp 18 Circuit

* Note bolt 

location 

differences of 

neutral riser 

depending 

on number of 

circuits.

Figure 6: SPD & Neutral Riser Connection Details for Revised P1 Panels

If panel is equipped with a neutral conductor:

•  (250A only, not required for 400A) Install Neutral Riser Support 

(item 10) per Figure 5 using #10-16 x ½” Type BT Slotted Hex 
Thread Forming Screw (item 11). Do not tighten at this time.

•  Attach Neutral Jumper (item 8) to top side of TPS3 (item 1) neutral 

tab with ¼-20 x 5/8” machine screw (item 4) and ¼”-20 SEMS nut 
(item 9). Do not tighten at this time. (400A panels only: rotate 
neutral jumper so single-hole end lands on SPD neutral to ensure 
proper height and fitment. Use (1) 5/16” - 18 slotted hex thread 
forming screw (item 13) to connect other end of neutral jumper 
to existing neutral bussing.)

•  (250A only, not required for 400A) Install Neutral Riser (item 12) 

per Figure 5. Use two (2) 5/16”-18 Slotted Hex Thread Forming 
Screws (item 13) to connect one end of Neutral Riser to existing 
Neutral Bussing provided with panel and other end of Neutral 
Riser to Neutral Riser Support. 

Torque all connections to the values as specified on the installation 
and maintenance instruction label affixed to the rear of the dead front.

Replace trim and deadfront.

8

8

Содержание TPS3 01

Страница 1: ...User Manual CANADA TPS3 Internal Manual Surge Protective Device ...

Страница 2: ...an lead to abnormally high voltages at the SPD This may cause the SPD to fail The warranty is voided if the SPD is incorrectly installed and or if the neutral conductor in the service entrance equipment or downstream of separately derived systems is not bonded to ground in accordance with the NEC Do Not Hi Pot Test SPDs Any factory or on site testing of power distribution equipment that exceeds no...

Страница 3: ...s 10 W Option Suffix 10 Operation 11 TPS3 Control Diagnostic Display Panel 11 Display Panel with Surge Counter Option 11 Dry Contacts Feature 11 Maintenance 12 Troubleshooting Service 12 Abnormal N G Voltage Indicators 12 Module Replacement Service 12 Display Replacement 12 Preventive Maintenance Inspection Testing 12 Corrective Maintenance Repair 12 Technical Support 12 Tables Table 1 Type Design...

Страница 4: ...enance Shouldfurther information be desired or should particular problems arise which are notcoveredsufficientlyforthepurchaser spurposes themattershould be referred to the local Siemens sales office Do Not Hi Pot Test SPDs Anyfactoryoron sitetestingofpowerdistributionequipmentthat exceedsnormaloperatingvoltagesuchashigh potentialinsulation testing or any other tests where the suppression componen...

Страница 5: ...s can be tested for Type 1 Type 2 or Type 3 applications Siemens TPS3 SPDs have the following Type designations Table 1 Type Designations SIEMENS TPS3 SERIES TYPE RATING TPS3 01 L1 Type 1 Component Assembly TPS3 02 L2 Type 1 Component Assembly TPS3 05 L5 Type 1 TPS3 06 L6 Type 1 Component Assembly For further information please review latest editions of NEC Art 285 UL 1449 contact your local Sieme...

Страница 6: ... 220V 3Ø 4W Plus Grnd Fig 2 L 600Y 347V 3Ø 4W Plus Grnd Fig 2 S 400Y 230V 3Ø 4W Plus Grnd Fig 2 SURGE CURRENT RATING TPS3 01 TPS3 L1 TPS3 02 TPS3 L2 TPS3 05 TPS3 L5 TPS3 06 TPS3 L6 10 100kA per phase 15 150kA per phase 20 200kA per phase 25 250kA per phase 30 300kA per phase 40 400kA per phase 45 450kA per phase 50 500kA per phase OPTION CODE DESCRIPTION TPS3 01 TPS3 L1 TPS3 02 TPS3 L2 TPS3 05 TPS...

Страница 7: ...ven rods etc NEC and IEEE Std 142 2007 are appropriate standards For sensitive electronics and computer systems ground impedance should be as low as possible When metallic raceway is used as an additional grounding conductor an insulated grounding conductor should be run inside the raceway and sized per the NEC Adequate electrical continuity must be maintained at all raceway connections Do not use...

Страница 8: ...tions A single 14 wire ribbon cable is attached to the display pcb When the ABC phase sequence changes to CBA the single connector is removed from the normal ABC jack and installed in the jack labeled CBA Lock off all power supplying this equipment before working on it Remove the trim and dead front Remove the two 2 dead front supports Position the TPS3 unit on the panel base rail so that the TPS3...

Страница 9: ...ire ribbon cable is attached to the display pcb When the ABC phase sequence changes to CBA the single connector is removed from the normal ABC jack and installed in the jack labeled CBA Lock off all power supplying this equipment before working on it Remove the trim and dead front Install the mounting bracket Item 5 to the base rail as shown in Figure 3 using two 2 of the 10 thread forming screws ...

Страница 10: ...er supplying this equipment before working on it Removethetrimanddeadfront IfSPDishard bussconnectedtobusses If connected through breaker see W option instructions on page 10 Attach Connectors items 5 6 7 to outboard and center Phase buss bars using 20 x slotted machine screws item 3 Each Connector is Phase specific Refer to Figures 5 6 top right for orientation For 400A use inner holes on outer p...

Страница 11: ...S3 item1 neutral tab with 20 x 5 8 machine screw item 4 and 20 SEMS nut item 9 Do not tighten at this time 400A panels only rotate neutral jumper so single hole end lands on SPD neutral to ensure proper height and fitment Use 1 5 16 18 slotted hex thread forming screw item 13 to connect other end of neutral jumper to existing neutral bussing 250A only not required for 400A Install Neutral Riser it...

Страница 12: ... TPS3 SPD module in Siemens TPS3 05 unit Figure 6 P4 P5 Front Connected Distribution Switchboards NOTE TPS3 06 unit may be replaced only if supplied with an internal disconnect Lock off all power supplying this equipment before working on it Open unit door and turn the internal disconnect to the off position Remove the neutral lug wire from the disconnect switch Remove the phase wires from the TPS...

Страница 13: ...ith or without one or more yellow stripes is to be installed as part of the circuit that supplies the filter Reference should be made to Table 250 122 of the National Electrical Code regarding the appropriate size of the grounding conductor b The grounding conductor mentioned in item a is to be grounded to earth at the service equipment or other acceptable building earth ground such as the buildin...

Страница 14: ...own with Surge Counter Figure 10 Display Vertical Shown with Surge Counter Dry Contacts Feature TPS3 01 05 and 06 units are equipped with dry contacts This feature provides Normally Open N O and Normally Closed N C circuits which can be used for remote indication of a failed transient voltage surge suppressor There is only one dry contact output consisting of two electrically isolated sets of NC C...

Страница 15: ...e systems where SPDs are designed for grounded systems SPDs for ungrounded systems generally have higher MCOV to allow for L G voltage fluctuations Failures of this nature are not defects in the SPDs workmanship or material This is an installation error and is not covered by warranty A differential voltage circuit monitors neutral to ground voltage When N G voltage becomes excessive an amplifier e...

Страница 16: ...ad East Oakville ON L6H 0H6 SPD Hotline 888 333 3545 info purgethesurge ca 2 16 15 lh 8225 European Authorized Representative Obelis s a Boulevard Général Wahis 53 1030 Brussels BELGIUM Tel 32 2 732 59 54 Fax 32 2 732 60 03 E Mail mail obelis net ...

Отзывы: