![Siemens SIWAREX WL230 BB-S SA Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/siemens/siwarex-wl230-bb-s-sa/siwarex-wl230-bb-s-sa_operating-instructions-manual_374535030.webp)
Load cell
Function/color of connecting cable
EXC+
EXC-
SIG+
SIG-
Sense+
Sense-
Shield not
connected
to the load
cell body
SIWAREX WL280
RN-S SA
Pink
Gray
Brown
White
n.a.
n.a.
Trans‐
parent
SIWAREX WL290
DB-S CA
Red
Black
Green
White
n.a.
n.a.
Trans‐
parent
Procedure
Note
Measurement errors
Observe the warnings concerning extending or shortening the connecting cables in section
→ Lengthening and shortening the connecting cable (Page 35).
If at all possible, do not shorten the connecting cables in a four-wire system.
Note
No calibration approval
In scales requiring official calibration, the connecting cables for load cells in a four-wire system
must not be shortened or lengthened.
1. Connect the recommended grounding cables: → Planning (Page 31)
2. Connect the load cells in accordance with the connection principle and with reference to the
specified signal assignments: → Connecting principle (Page 26)
3. For load cells with a four-wire system, position the wire jumpers in the junction box as
follows:
Table 5-2
Wire jumpers for load cells with four-wire system
Wire jumper
From terminal
To terminal
1
EXC-
SENSE-
2
EXC+
SENSE+
Note
Malfunction
If the wire jumpers are missing, the SIWAREX weighing module signals a wire break.
Connecting
5.3 Connecting up
SIWAREX WL200
30
Operating Instructions, 12/2021, A5E02199611B-13
Содержание SIWAREX WL230 BB-S SA
Страница 6: ...Table of contents SIWAREX WL200 6 Operating Instructions 12 2021 A5E02199611B 13 ...
Страница 10: ...Introduction 1 6 Notes on warranty SIWAREX WL200 10 Operating Instructions 12 2021 A5E02199611B 13 ...
Страница 24: ...Installing 4 3 Dismantling SIWAREX WL200 24 Operating Instructions 12 2021 A5E02199611B 13 ...