5.2
Connecting principle
Load cells can be equipped with connecting cables with four or six cores.
WARNING
Risk of explosion
Please observe that in the case of shielded cables of intrinsically safe circuits in hazardous areas
only one grounding is permissible.
If grounding is to be on both sides an equipotential bonding conductor with at least 4 mm²
must be connected.
Connecting
5.2 Connecting principle
SIWAREX WL200
26
Operating Instructions, 12/2021, A5E02199611B-13
Содержание SIWAREX WL230 BB-S SA
Страница 6: ...Table of contents SIWAREX WL200 6 Operating Instructions 12 2021 A5E02199611B 13 ...
Страница 10: ...Introduction 1 6 Notes on warranty SIWAREX WL200 10 Operating Instructions 12 2021 A5E02199611B 13 ...
Страница 24: ...Installing 4 3 Dismantling SIWAREX WL200 24 Operating Instructions 12 2021 A5E02199611B 13 ...