Commissioning
SITRANS WF100
Operating Instructions, 02/2012, 7ML19985NB01-01
29
4.
After the span calibration has been completed, remove the test weight and pulley and store
them.
①
SITRANS WF100 housing
②
Hook
③
Calibration access hole (remove plug to access hook during calibration)
④
Retaining pin
⑤
Calibration pulley
⑥
Sensing plate
⑦
Calibration bracket
⑧
Cable
⑨
Test weight
Material test
Calibration of the flowmeter by test weight is not a dynamic simulation and yields only an
approximate span calibration. Effective material flow, friction, and velocity can only be
reproduced by running actual material tests.
At least two 5 minute samples should be taken to ensure repeatability. Refer to material test and
subsequent factoring of the flowmeter sections of the integrator manual.
Re-rating
Consult your local Siemens Milltronics representitive for re-rating.
Содержание SITRANS WF100
Страница 1: ...SITRANS Solid Flowmeters SITRANS WF100 Operating Instructions 02 2012 ...
Страница 6: ...Table of contents SITRANS WF100 4 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 8: ...Introduction SITRANS WF100 6 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 22: ...Description 3 1 Material feed examples SITRANS WF100 20 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 26: ...Installing Mounting SITRANS WF100 24 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 28: ...Connecting SITRANS WF100 26 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 32: ...Commissioning SITRANS WF100 30 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 42: ...Technical data SITRANS WF100 40 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 44: ...Dimension drawings SITRANS WF100 42 Operating Instructions 02 2012 7ML19985NB01 01 ...