
Installing/Mounting
SITRANS WF100
22
Operating Instructions, 02/2012, 7ML19985NB01-01
Load cell handling
WARNING
Negative displacement on the load cell can functionally destroy the load cell. When
handling the load cell, care must be taken not to force the gap open.
Figure 4-1
Support load cell throughout handling in non-vertical positions
Figure 4-2
Improper handling may functionally destroy the load cell
Installation
1.
Set the flowmeter housing in place ensuring that the flowguide and outlet gaskets are
correctly located (gaskets supplied by customer).
2.
The housing must be vertical within 1° in two planes 90° apart.
3.
Bolt the flowguide and outlet flanges to the process piping.
Содержание SITRANS WF100
Страница 1: ...SITRANS Solid Flowmeters SITRANS WF100 Operating Instructions 02 2012 ...
Страница 6: ...Table of contents SITRANS WF100 4 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 8: ...Introduction SITRANS WF100 6 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 22: ...Description 3 1 Material feed examples SITRANS WF100 20 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 26: ...Installing Mounting SITRANS WF100 24 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 28: ...Connecting SITRANS WF100 26 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 32: ...Commissioning SITRANS WF100 30 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 42: ...Technical data SITRANS WF100 40 Operating Instructions 02 2012 7ML19985NB01 01 ...
Страница 44: ...Dimension drawings SITRANS WF100 42 Operating Instructions 02 2012 7ML19985NB01 01 ...