7MF4232
Operating Instructions
20
C79000-B5676-C92-01
D
Measuring liquids
The isolating valves must be operated in the following order:
Initial position: all valves closed
- Open isolating valve (2B),
- Apply pressure corresponding to the start of the scale through the test connection of the isolating
valve (2) to the transmitter,
- Check the start of scale and correct if necessary,
- Close the isolating valve (2B),
- Open the isolating valve (4) on the pressure tapping point,
- Open isolating valve (2A).
1
2
2B
2A
3
6
1
Transmitter
2
Isolating valve
A isolating valve to the process
B isolating valve for test connection
or venting screw
3
Pressure pipe
4
Isolating valve
6
Outlet valve
4
Figure 3.2 Measuring liquids
D
Measuring steam
The isolating valves must be operated in the following order:
Initial position: all valves closed
- Open isolating valve (2B),
- Apply pressure corresponding to the start of the scale through the test connection of the isolating
valve (2) to the transmitter,
- Check the start of range and correct if necessary,
- Close the isolating valve (2B),
- Open the isolating valve (4) on the pressure tapping nipple,
- Open isolating valve (2A).
1
2
2B
2A
3
6
1
Transmitter
2
Isolating valve
A isolating valve to the process
B isolating valve for test connection
or bleed screw
3
Pressure pipe
4
Isolating valve
6
Outlet valve
9
Condensate reservoir
4
9
Figure 3.3 Measuring steam
Содержание SITRANS P 7MF4232
Страница 4: ...7MF4232 Operating Instructions 2 C79000 B5676 C92 01 ...
Страница 36: ...7MF4232 Operating Instructions 34 C79000 B5676 C92 01 6 Conformance Certificates ...
Страница 37: ......