Siemens AG
⋅
May 1998
4.7.5.2 Bayout of service
For maintenance work in the bay, the bay has to be
taken out of service.
Taking the bay unit out of service is possible:
D
by operation from the master unit (
DA 6400/ZE
),
D
via binary inputs at the related bay unit (
FNr.
7029/FE
) or
D
by local operation at the bay unit (
DA 4500/FE
).
In order to avoid tripping of a bus zone in operation by
infeed of test currents into the bay unit, the master
unit must recognize the taking out of service of a bay.
Therefore the control facilities for the bay unit are adĆ
ditionally interlocked. The control "bay out of service"
is released for all bay units with parameter (
DA
6317/ZE
) (figure 4.30).
operation ZE
bay out of service
operation BU
DA 6400/ZE
DA 4500/FE
1
&
(feeder-selective)
1
feeder out of serĆ
vice
7029/FE
BU REL AaB
"released"
DA 6317/ZE
If during maintenance work in a bay it must be expecĆ
ted that the auxiliary voltage of the bay unit or for the
binary inputs is interrupted or the FO-connection to
the master units is interrupted, then the related bay
unit has to be taken out of service by the parameter
"service" (
DA 64xx/ZE
). All configured isolators of
the bay are assumed to have OPEN-status. In case
of the bus coupler this status is automatically assuĆ
med for both coupler bay units.
The check zone considers all bays, irrespective of
whether they are switched on or off, as long as the
bay unit is supplied with auxiliary voltage and the data
link to the master unit was uninterrupted.
By this measure the danger of spurious tripping is
avoided in case of an overfunction of the binary input.
The check zone also prevents spurious tripping, if afĆ
ter maintenance works the switch is not returned to
service and when switching onto an external short-
circuit (short-circuit in the feeder).
In case of maintenance works including current transĆ
former checks, the FO-link to the master unit should
be interrupted as an additional measure against overĆ
function.
www
. ElectricalPartManuals
. com
Содержание SIPROTEC 7SS52
Страница 1: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 2: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 3: ... Siemens AG 1998 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 6: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 17: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 33: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 34: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 35: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 36: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 44: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 166: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 168: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 170: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 184: ... 1 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 186: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 202: ... 0 0 0 w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 206: ... X w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 208: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 209: ...w w w E l e c t r i c a l P a r t M a n u a l s c o m ...
Страница 210: ... w w w E l e c t r i c a l P a r t M a n u a l s c o m ...